BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 18, 2025

This is a service / maintenance or supply contract in Staunton, Virginia. Contact the soliciting agency for additional information.

The purpose of this project is to improve safety, traffic operations and reliability along Interstate 81 by adding a third travel lane in each direction. The project totals 6.8 miles of I-81 widening and pavement rehabilitation in Harrisonburg and Rockingham County. The additional lanes will be added to the inside (median side) between mile markers 242.0 and 248.8. Specific improvements include: One additional lane northbound and southbound from approximately one mile south of the exit 243 (Route 11) interchange near Pleasant Valley Road to approximately one mile north of the exit 247 (Route 33/East Market Street) interchange. Replacement of northbound and southbound I-81 bridges with single, wider structures at four crossing locations: Over Blacks Run near mile marker 242.4. Over the Norfolk Southern Railway near mile marker 244.4. Over Blacks Run near mile marker 244.5. Over Country Club Road and Norfolk Southern Railway near mile marker 247.7. Replacement of the Pleasant Valley Road bridge over I-81 near mile marker 243.5. Replacement of an existing traffic signal at the intersection of Early Road and Pleasant Valley Road with a roundabout. Maintain or enhance operational safety with the installation of a concrete median barrier between northbound and southbound traffic, and through improved signs and pavement markings. Make sensible use of existing pavement and rights-of way to accomplish capacity improvements. New I-81 travel lanes will be constructed to the median side where possible. Construction of approximately four miles of noise barrier walls. Barrier locations are based on VDOT noise analysis and input from property owners and tenants in affected areas. Construction of stormwater management systems along the I-81 corridor, at James Madison University along Paul Street, and near the intersection of Reservoir Street and Ridgeville Lane. In 2019 Route I-81 through Harrisonburg had an average daily traffic count of 58,000 vehicles per day. By the design year of 2047 the estimated average daily traffic volume is 81,300 vehicles per day. The Interstate 81 Harrisonburg-Area Widening (Exit 243 to Exit 247) is among 65 construction projects in the I-81 Corridor Improvement Program (CIP). The CIP unlocks I-81 by enhancing safety and reliability, reducing congestion and supporting economic growth along the interstate's 325 miles in Virginia. Find out more at https://improve81.vdot.virginia.gov. Scope of Work includes the following (subject to change): MATERIALS: BUY AND HAUL AGGREGATES AND AGG BASE, BUY AND HAUL BORROW, BRIDGE BEARINGS, CONCRETE READY MIX, EROSION CONTROL MATERIALS, POLYLINER MATERIAL, NOISE WALL PANELS, PRECAST DRAINAGE STRUCTURES, REBAR MATERIALS, REINFORCED CONCRETE PIPE, SIP METAL DECK, STEEL H PILES, TEMPORARY CONCRETE BARRIER WALL, BUY AND HAUL TOPSOIL, UNDERDRAIN MATERIALS, BUY AND HAUL RIP RAP, BRIDGE EXPANSION JOINT, UTILITY PIPE VALVE & FITTINGS, STEEL GIRDERS, FORMWORK MATERIALS, CORRUGATED METAL PIPE, GEOTEXTILES, MOT MATERIALS SUBCONTRACTORS: ASBESTOS ABATEMENT SUB, ASPHALT, BRIDGE DEMO SUB, CLEAR & GRUB SUB, EXPLORITORY DRILLING, DUMPSTERS, EROSION CONTROL SUB, FENCE SUB, FUEL, GROOVING SUB, GUARDRAIL SUB, HOURLY HAULING, ITS SUB, LANDSCAPING SUB, LIGHTING SUB, DEMO MILLING, TRAFFIC CONTROL DEVICES SUB, NOISE WALL SUB, STRIPING SUB, PILE INSPECTION CONSULTANT, CONC SLIP BARRIER WALL SUB, PIPE REHAB/PIPE LINING, QUALITY CONTROL SUB, REBAR SUB, SAWCUT SUB, GRASSING SUB, SIGN SUB, SIGNAL SUB, CURB & SIDEWALK SUB, STORM DRAIN SUB, UNDERDRAIN SUB, PIPES DESILT/VIDEO INSPECTION, ASPHALT CURB, IMPACT ATTENUATOR SUB, CARBON FIBER WRAP, DEWATERING SUB, FULL DEPTH RECLAMATION, HANDRAIL SUB, HYDRODEMOLITION SUB, JACK AND BORE SUB, MICROPILE SUB, MOWING/LITTER PICK UP, METAL DECK SUB, PAINTING SUB, CONCRETE PUMPING, RUMBLE STRIP, STEEL GIRDER ERECTION SUB, WET UTILITIES, BRIDGE WATERPROOFING Bid Instructions: Quotes are due by DECEMBER 12, 2025, end of business day. Letting date is December 17th, 2025

Post-Bid

Roads / Highways

$25,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
61
Bidding Soon
807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

February 11, 2026

Project location map

I-81, Staunton, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.