Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2025 at 8:00 PM
Updated March 19, 2025
Renovation of a mixed-use development in Gilbert, South Carolina. Completed plans call for the renovation of a educational facility.
Mold Remediation-Ctr for School Safety Question Deadline 01/30/2025 at 10:00 AM ET James Jackson, jjackson@sled.sc.gov SCOPE OF WORK/SPECIFICATIONS The South Carolina Law Enforcement Division (SLED) is seeking bids for mold remediation services at Building 200 of the SLED Center for School Safety in Gilbert, SC as per the attached specifications. Contractor shall: Clean all surfaces within the building. The Institute of Inspection Cleaning and Restoration Certification (IICRC) defines Condition 3 as an indoor environment contaminated with the presence of actual mold growth, associated spores, and fungal fragments. Actual growth includes growth that is active or dormant, visible or hidden. Condition 2 is defined as an indoor environment which is primarily contaminated with settled spores or fungal fragments that were dispersed directly or indirectly from a Condition 3 area, and which may have traces of actual growth. The goal of remediation is to return the indoor environment to Condition 1, which is defined as an indoor environment that may have settled spores, fungal fragments or traces of actual growth whose identity, location and quantity are reflective of a normal fungal ecology for a similar indoor environment. Based on visual observations, the surfaces throughout the building are considered Condition 2 and/or 3. IICRC S520 provides specific guidelines for cleaning porous, semi-porous, and non-porous items. SLED does not intend to instruct the Remediation Contractor on how to clean every surface; however, it is recommended that the Contractor follow the guidelines and recommendations within IICRC S520. Clean ductwork within the building. Remove two (2) bulletin boards with fungal growth. All contents and moveable items within the building will be removed by SLED prior to remediation. Upon completion of remediation, a post remediation verification and assessment, to include a visual examination and air samples, will be performed by a third party on behalf of SLED. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Award
Educational
$9,830.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2025
March 21, 2025
314 Main St, Gilbert, SC
Related To This Project
Gilbert, SC
Bid Date: Mar 28 2025
Gilbert, SC
Bid Date: Dec 02 2025
Gilbert, SC
Bid Date: Nov 14 2025
Gilbert, SC
Bid Date: Oct 29 2024
Gilbert, SC
Bid Date: Oct 29 2024
Gilbert, SC
Bid Date: Nov 19 2024
Gilbert, SC
Bid Date: Jul 23 2024
Gilbert, SC
Bid Date: Nov 12 2024
Gilbert, SC
Bid Date: Apr 18 2024
Gilbert, SC
Bid Date: Sep 18 2023
Gilbert, SC
Bid Date: Mar 28 2019
Gilbert, SC
Bid Date: Jun 08 2023
Gilbert, SC
Bid Date: Mar 01 2023
Gilbert, SC
Bid Date: May 25 2022
Gilbert, SC
Bid Date: Apr 22 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
