Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 15, 2025 at 8:00 PM
Updated April 16, 2025
Site work and paving for a mixed-use development in Bruceton Mills, West Virginia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
**As of April 15, 2025, this project has not yet been awarded. A timeline for award has not yet been established.** The project will be bid in two separate contracts. Water Development Projects: Construction time limit is (180) calendar days with liquidated damages of one thousand dollars ($1,000.00) per day. Contract #A consists of the construction of the following: Raw waterline system expansion to include the installation of approximately 16,500 LF of 8" HDPE pipe trenched, four HDD directional bores, and also includes: valves, fittings, steel conduit, air release valves, bypass meter assemblies, tree removal, street, sidewalk and driveway repairs, E&S Controls and all other necessary appurtenances required to complete the raw water system. Contract #B consists of the construction of the following: Drill, test and develop one new water well, test and develop an existing water well, upgrade five existing well pumps, upgrade electric service to one existing well, site work, grading, tree removal, fencing, gates, stone, driveways, paving, E&S controls, electric service and controls, radio telemetry and all other necessary appurtenances required to complete two well sites. Bids shall be accompanied by a certified check or bid bond payable to Preston County PSD #4, in an amount equal to five percent (5%) of the base bid. All project related technical questions for the above-mentioned project shall be directed to Richard Gaines, P.E. at Stantec Consulting Inc. (304) 816-5190. Engineers Estimate: Contract A=$1,300,000 Contract B=$360,000 The engineers estimate for each contract is as follows: Contract Number A - $1,805,280.00 Contract Number B - $353,387.00 All questions shall be submitted to Stantec by 5:00 PM on February 6, 2025 Bid results - BID TABULATION CONTRACT A - Kurkurin Contracting, Inc - $1,535,353 BID TABULATION CONTRACT B - Farley Drilling, Inc - $975,000
Bid Results
Water / Sewer
$2,510,353.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
April 14, 2025
Multiple Locations, Bruceton Mills, WV
Related To This Project
Bruceton Mills, WV
Bid Date: May 15 2025
Bruceton Mills, WV
--
Bruceton Mills, WV
--
Bruceton Mills, WV
Bid Date: Jun 25 2025
Bruceton Mills, WV
Bid Date: Jun 25 2025
Bruceton Mills, WV
Bid Date: Nov 20 2025
Bruceton Mills, WV
--
Bruceton Mills, WV
Bid Date: Nov 20 2025
Bruceton Mills, WV
Bid Date: Feb 11 2025
Bruceton Mills, WV
Bid Date: Sep 24 2024
Bruceton Mills, WV
Bid Date: Sep 24 2024
Bruceton Mills, WV
Bid Date: May 16 2024
Bruceton Mills, WV
Bid Date: Apr 29 2024
Bruceton Mills, WV
Bid Date: Apr 25 2024
Bruceton Mills, WV
Bid Date: Apr 11 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
