BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Site work and paving for a mixed-use development in Bruceton Mills, West Virginia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of April 15, 2025, this project has not yet been awarded. A timeline for award has not yet been established.** The project will be bid in two separate contracts. Water Development Projects: Construction time limit is (180) calendar days with liquidated damages of one thousand dollars ($1,000.00) per day. Contract #A consists of the construction of the following: Raw waterline system expansion to include the installation of approximately 16,500 LF of 8" HDPE pipe trenched, four HDD directional bores, and also includes: valves, fittings, steel conduit, air release valves, bypass meter assemblies, tree removal, street, sidewalk and driveway repairs, E&S Controls and all other necessary appurtenances required to complete the raw water system. Contract #B consists of the construction of the following: Drill, test and develop one new water well, test and develop an existing water well, upgrade five existing well pumps, upgrade electric service to one existing well, site work, grading, tree removal, fencing, gates, stone, driveways, paving, E&S controls, electric service and controls, radio telemetry and all other necessary appurtenances required to complete two well sites. Bids shall be accompanied by a certified check or bid bond payable to Preston County PSD #4, in an amount equal to five percent (5%) of the base bid. All project related technical questions for the above-mentioned project shall be directed to Richard Gaines, P.E. at Stantec Consulting Inc. (304) 816-5190. Engineers Estimate: Contract A=$1,300,000 Contract B=$360,000 The engineers estimate for each contract is as follows: Contract Number A - $1,805,280.00 Contract Number B - $353,387.00 All questions shall be submitted to Stantec by 5:00 PM on February 6, 2025 Bid results - BID TABULATION CONTRACT A - Kurkurin Contracting, Inc - $1,535,353 BID TABULATION CONTRACT B - Farley Drilling, Inc - $975,000

Bid Results

Water / Sewer

$2,510,353.00

Public - County

Paving, Site Work

48

28

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
60
Bidding Soon
1,248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 14, 2025

Project location map

Multiple Locations, Bruceton Mills, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.