Published January 31, 2025 at 7:00 PM
Updated February 27, 2025
Renovation of a municipal facility in Fitchburg, Massachusetts. Completed plans call for the renovation of a municipal facility.
Project IT Room Buildout and Conference Room Subdivision. Location of work is the Intermodal Transportation Center (ITC)150 Main St., Fitchburg MA Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Project includes General Carpentry, HVAC installation, Lighting and Electrical work, some plumbing work & fire suppression install. Site Location(s): 100-160 Main Street, Fitchburg, MA 01420 Deadline for Questions: Monday, February 10, 2025 @ 10AM Questions and RFR response should be sent via email to procurement@mrta.us IT ROOM BUILDOUT: Goal: Construct a new IT room that integrates existing servers into the space. 1. Wall Construction: o Build the North wall (9'10") and East wall (6'7") using 5/8" fire-rated sheetrock and minimum R15 insulation. West and South walls are preexisting. o Walls to be framed above the existing office ceiling, mounted to existing framing above, and carpet cut back and mounted to the existing concrete floor. o Coordinate with MART for paint colors and finish. 2. Door Installation: o Install a 36"x84" commercial fire-rated door on the left side of the South wall. 3. Plumbing Modifications: o Relocate and replumb the water fountain from the South wall to the new North wall per the layout provided. 4. Fire Protection Adjustments: o Relocate or terminate the existing sprinkler head in this space per code. Install a properly sized FM-200 fire suppression unit for the server room, ensuring it complies with all applicable codes and regulations. o Tie the FM-200 unit back to the existing fire suppression panel located in the parking garage storage area. 5. Ceiling Modifications: o Modify and remount the existing drop ceiling frame to the newly constructed walls on both inner and outer sides. 6. Lighting and Electrical Work: o Re-center existing lights in the new IT room space and wire them independently for this room. o Place the two existing outlets on the South wall on a separate breaker. The panel is located roughly 80 ft from the existing outlets. 7. Flooring Installation: o Remove the existing carpet and install VCT tile flooring with coordinating cove base provided by MART. 8. HVAC Installation: o Install a properly sized mini-split system for adequate ventilation and temperature control.
Post-Bid
Municipal
$80,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2025
March 28, 2025
100 Main St, Fitchburg, MA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.