Published January 31, 2025 at 7:00 PM

Updated February 27, 2025

Renovation of a municipal facility in Fitchburg, Massachusetts. Completed plans call for the renovation of a municipal facility.

Project IT Room Buildout and Conference Room Subdivision. Location of work is the Intermodal Transportation Center (ITC)150 Main St., Fitchburg MA Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Project includes General Carpentry, HVAC installation, Lighting and Electrical work, some plumbing work & fire suppression install. Site Location(s): 100-160 Main Street, Fitchburg, MA 01420 Deadline for Questions: Monday, February 10, 2025 @ 10AM Questions and RFR response should be sent via email to procurement@mrta.us IT ROOM BUILDOUT: Goal: Construct a new IT room that integrates existing servers into the space. 1. Wall Construction: o Build the North wall (9'10") and East wall (6'7") using 5/8" fire-rated sheetrock and minimum R15 insulation. West and South walls are preexisting. o Walls to be framed above the existing office ceiling, mounted to existing framing above, and carpet cut back and mounted to the existing concrete floor. o Coordinate with MART for paint colors and finish. 2. Door Installation: o Install a 36"x84" commercial fire-rated door on the left side of the South wall. 3. Plumbing Modifications: o Relocate and replumb the water fountain from the South wall to the new North wall per the layout provided. 4. Fire Protection Adjustments: o Relocate or terminate the existing sprinkler head in this space per code. Install a properly sized FM-200 fire suppression unit for the server room, ensuring it complies with all applicable codes and regulations. o Tie the FM-200 unit back to the existing fire suppression panel located in the parking garage storage area. 5. Ceiling Modifications: o Modify and remount the existing drop ceiling frame to the newly constructed walls on both inner and outer sides. 6. Lighting and Electrical Work: o Re-center existing lights in the new IT room space and wire them independently for this room. o Place the two existing outlets on the South wall on a separate breaker. The panel is located roughly 80 ft from the existing outlets. 7. Flooring Installation: o Remove the existing carpet and install VCT tile flooring with coordinating cove base provided by MART. 8. HVAC Installation: o Install a properly sized mini-split system for adequate ventilation and temperature control.

Post-Bid

Municipal

$80,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
791
Active Projects
412
Bidding Soon
4,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

Project location map

100 Main St, Fitchburg, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.