Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 1, 2025 at 8:00 PM
Updated May 2, 2025
Renovation of a residential development in New York, New York. Completed plans call for the renovation of a residential development.
The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 14 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Supply and install 2 Mitsubishi hyper heat or equivalent 12,000 BTU ductless split system with 5 diffusers for homes rooms. MORE may be added on at the walkthrough. 2. Supply and install wireless thermostat Mkh2 or equivalent. 3. Condenser to be mounted with wall bracket 10" off the ground for proper operation. 4. Supply and install (2) 12000 BTU wall mounted Mitsubishi hyper heat or equivalent ductless split system condensors with 5 heads for the upstairs rooms. 5. Supply and install wireless Mkh2 thermostats to control the units inside the home. 6. All Line set must be properly covered. 7. AC system to include Installation of all copper refrigerant piping. 8. All copper piping and fittings installed must be Pro Pressed with appropriate fittings. 9. No Hot work to be done unless a maintenance crew is onsite with safety notified and a fire extinguisher on hand. 10. Installation of all required electrical wiring to be completed by a licensed electrician and inspected by a third-party electrician with provided certificate to meet all current codes. 11. Installation of all condensate piping, insulation, and all parts for a complete tested functional system with 3-year guarantee. 12. Charging and testing of system as required, testing of units and ensuring neat proper install. 13. Supply and install safety disconnect switches to be placed outdoors or inside depending on application. 14. Split System to be wired to dedicated breakers with appropriate amperage. 15. 3-year Warranty on all parts and labor. 16. All walls and penetrations made during work to be patched and plastered for a smooth finish. 17. Third party electrical inspection is at the sole cost of winning vendor. 18. Changes may be made at the day of the site visit and recorded for all vendors as to be on the same page to submit the proper quote. 19. BFDDSO reserves the right to move onto the next vendor if qualifications are not met. Question Deadline 02/10/2025 Any questions or requests for clarification regarding the information provided may be directed to Brooklyn.CMM.Bids@opwdd.ny.gov
Post-Bid
Residential Subdivision
$50,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2025
April 7, 2025
73-32 172nd St, New York, NY
Related To This Project
New York, NY
--
New York, NY
Bid Date: Feb 28 2025
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Apr 30 2025
New York, NY
Bid Date: Jan 27 2025
New York, NY
Bid Date: Feb 14 2025
New York, NY
Bid Date: Feb 19 2025
New York, NY
--
New York, NY
Bid Date: Mar 05 2025
New York, NY
Bid Date: Mar 05 2025
New York, NY
Bid Date: Mar 03 2025
New York, NY
Bid Date: Feb 07 2025
New York, NY
Bid Date: Feb 25 2025
New York, NY
Bid Date: Jan 31 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
