EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a residential development in New York, New York. Completed plans call for the renovation of a residential development.

The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 14 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Supply and install 2 Mitsubishi hyper heat or equivalent 12,000 BTU ductless split system with 5 diffusers for homes rooms. MORE may be added on at the walkthrough. 2. Supply and install wireless thermostat Mkh2 or equivalent. 3. Condenser to be mounted with wall bracket 10" off the ground for proper operation. 4. Supply and install (2) 12000 BTU wall mounted Mitsubishi hyper heat or equivalent ductless split system condensors with 5 heads for the upstairs rooms. 5. Supply and install wireless Mkh2 thermostats to control the units inside the home. 6. All Line set must be properly covered. 7. AC system to include Installation of all copper refrigerant piping. 8. All copper piping and fittings installed must be Pro Pressed with appropriate fittings. 9. No Hot work to be done unless a maintenance crew is onsite with safety notified and a fire extinguisher on hand. 10. Installation of all required electrical wiring to be completed by a licensed electrician and inspected by a third-party electrician with provided certificate to meet all current codes. 11. Installation of all condensate piping, insulation, and all parts for a complete tested functional system with 3-year guarantee. 12. Charging and testing of system as required, testing of units and ensuring neat proper install. 13. Supply and install safety disconnect switches to be placed outdoors or inside depending on application. 14. Split System to be wired to dedicated breakers with appropriate amperage. 15. 3-year Warranty on all parts and labor. 16. All walls and penetrations made during work to be patched and plastered for a smooth finish. 17. Third party electrical inspection is at the sole cost of winning vendor. 18. Changes may be made at the day of the site visit and recorded for all vendors as to be on the same page to submit the proper quote. 19. BFDDSO reserves the right to move onto the next vendor if qualifications are not met. Question Deadline 02/10/2025 Any questions or requests for clarification regarding the information provided may be directed to Brooklyn.CMM.Bids@opwdd.ny.gov

Post-Bid

Residential Subdivision

$50,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
545
Active Projects
319
Bidding Soon
4,964
All Active Projects
2,247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2025

April 7, 2025

img_map_placeholder

73-32 172nd St, New York, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Supply & Install 12,000 BTU Split System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.