BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work and paving for a mixed-use development in Kyle, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Proposals Shall Be Plainly Marked With Name and Address of the Bidder and the Following, Bolded, Words: Anthem Subdivision Phase 1b Improvements the Rm 150 Ltl & Decel Ln Mtn City Improvements Proposal Includes Approximately: 16 Sta of Right of Way Preparation and 1,356 Lf of Roadway; 56 Lf of Rcp Driveway Culvert With Sets, a New Signal at Anthem Parkway, Pedestrian Facilities, and All Other Necessary Appurtenances and Improvements. All Work Must Conform to State of Texas, County of Hays, City of Kyle, Txdot, Tceq, and Anthem Mud Applicable Rules and Criteria. A Cashier's Check, Certified Check or Acceptable Bidder's Bond, Payable to Kyle 150, Lp in an Amount Not Less Than Five Percent (5%) of the Bid Must Accompany Each Bid as a Guarantee That, if Awarded the Contract, the Bidder Will Enter Into a Contract and Execute Bonds Within Ten (10) Days of Award of the Contract. Performance and Payment Bonds Shall Also Be Executed on the Forms Furnished by the District and Shall Specifically Provide for "performance" and for "labor and Materials Payment". Each Bond Shall Be Issued in an Amount of One Hundred Percent (100%) of Contract Price by a Solvent Surety Company, Authorized to Do Business in the State of Texas and Acceptable to the District. The District Reserves the Right to Reject Any and All Bids to Waive Any and All Technicalities and Formalities in Bidding. The District Reserves the Right to Determine Which Bids Are Most Advantageous to the Owner and the District, and to Award the Contract on This Basis. No Bid May Be Withdrawn for a Period of Forty-five (45) Days After Opening of the Bids. If a Submitted Bid is Withdrawn Within Said Period, Bid Guaranty Shall Become the Property of the Owner, Not as Penalty, but as Liquidated Damages, or District May Pursue Any Other Action Allowed by Law.

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

112

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
71
Bidding Soon
2,669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.