EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 9, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Lake in the Hills, Illinois. Completed plans call for site work for a 4,100-square-foot playground / park / athletic field.

Scope of Work The Village of Lake in the Hill s ( " Villag e " ) intends to hire a qualified contractor ( " Contracto r " ) to provide all labor, equipment, and materials necessary to reconstruct the full- sized basketball court at Jaycee Park , 61 Oakleaf Road. Scott Parchutz, Public Properties Superintendent, will be the Village's project manager. Court Dimensions The existing Jaycee Park basketball court is approximately 50' x 82'. The Contractor shall reconstruct the existing asphalt court, which will equal approximately 4,100 square feet. While reconstructing the existing asphalt court, the contractor shall leave the existing basketball goals, which shall be reused and remain in their current locations. Further, the playable court area shall remain the same and be marked in the same manner as the existing layout. All sizes, square footage, and dimensions are approximate, whereby it is incumbent on the Contractor to field-verify them to ensure accuracy before bid submittal.Asphalt Reconstruction The Contractor shall set up and install temporary construction fencing around the entire construction area. The C ontractor shall undercut the court in its entirety and remove and dispose of the existing asphalt and subbase to ensure that the court has a minimum base thickness of fourteen inches. All spoils shall be hauled away and disposed of off-site. The Contractor shall furnish and install GEOGRID TRIAX ground stabilization material. Furnish and install ten inches of CA-1 Stone base and compact. Furnish and install four inches of CA-6 Stone base and compact. The Contractor shall t reat the whole area with a sterilant to prevent future flora growth and shall compact the en tire base with not less than a five-ton vibratory roller , with two passes minimum in each direction. The base shall not deviate more than 1/2 inches when measured with a 10-foot straight edge. The Contractor shall supply and install the HMA surface course (Mix " C " N 50). The surface course shall be placed in two layers , each 1.5 inches thick when compacted, for a total compacted thi ckness of 3.0 inches. The a sphalt shall be installed , machine laid, and compacted with vibratory asphalt rollers. The Contractor shall roll smooth the asphalt surface course , and the surface shall not vary more than 3/4 inch from the established grade. The Contractor shall ensure all drainage flow is directed toward the edge of the asphalt , and the slope of the court shall be .8 - 1.2% from end to end. When performing the asphalt overlay, the Contractor shall transition all edges to prevent pedestrian trip ha zards and hand-tamp all exposed edges. Questions must be submitted by February 11, 2025

Bid Results

Playgrounds / Parks / Athletic Fields

$49,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
171
Bidding Soon
2,472
All Active Projects
1,285
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

img_map_placeholder

61 Oakleaf Rd, Lake in the Hills, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jaycee Park Basketball Court Renovation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.