Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 24, 2025 at 8:00 PM
Updated August 26, 2025
Site work for a water / sewer project in San Lorenzo, California. Completed plans call for site work for a water / sewer project.
Sewer Line Replacement Project Phase 8 . Questions regarding the bid package should be directed in writing as soon as possible (but no later than five working days prior to the opening of bids) to: Kristopher Decker, Phone: 510.481.6990, email: kdecker@oroloma.org. Where appropriate, the District may respond to such questions by addenda transmitted to all bid package recipients. Question Deadline 02/20/2025 OLSD Manager :Kristopher Decker. Doc note - Checks and money orders must be made payable to the Oro Loma Sanitary District. Cash will not be accepted. Bid packages will be mailed upon request and receipt of the nonrefundable charge and the bidder's UPS or FedEx account number The project contractor shall furnish all tools, equipment, apparatus, facilities, labor and material necessary to perform and complete in a good and workmanlike manner the construction of the SEWER COLLECTION SYSTEM PIPELINE REHABILITATION AND REPLACEMENT PROJECT PHASE 8 as shown in the project technical specifications and plans and in accordance with the contract documents within 365 calendar days of the project commencement date specified in the notice to proceed for the project. 5. The project work is generally described as: PHASE 8: the replacement of 12,749 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 3,327 linear feet of 8-inch VCP with 10- inch HDPE pipe; 1,399 linear feet of 10-inch VCP with 12-inch HDPE pipe; and the reconnection of all laterals and re-channelization of all manholes, as shown on the plans and specifications. The warranty or maintenance bond must be in the amount of ten (10) percent of the final Project contract amount and guaranty the Project work against defects in materials, equipment, workmanship, or needed repair for one (1) year from the District's acceptance of the Project work
Award
Water / Sewer
$5,759,460.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
March 31, 2025
Multiple Locations, San Lorenzo, CA
Related To This Project
San Lorenzo, CA
Bid Date: Apr 17 2025
San Lorenzo, CA
Bid Date: May 13 2025
San Lorenzo, CA
Bid Date: May 29 2025
San Lorenzo, CA
Bid Date: Jul 31 2025
San Lorenzo, CA
Bid Date: Sep 01 2021
San Lorenzo, CA
Bid Date: Sep 22 2021
San Lorenzo, CA
Bid Date: Feb 19 2021
San Lorenzo, CA
Bid Date: Jan 28 2025
San Lorenzo, CA
Bid Date: Nov 07 2024
San Lorenzo, CA
Bid Date: Oct 24 2024
San Lorenzo, CA
Bid Date: Nov 08 2024
San Lorenzo, CA
Bid Date: Jul 26 2024
San Lorenzo, CA
Bid Date: Apr 25 2024
San Lorenzo, CA
Bid Date: Feb 15 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
