Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2025 at 8:00 PM
Updated March 19, 2025
Site work and paving for a mixed-use development in Maple Grove, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work includes the furnishing of all labor and materials for the construction, complete in-place, of the following approximate quantities: 805 LF 8" PVC Sanitary Sewer Pipe 550 LF 4" PVC Sanitary Service Pipe 950 LF 8" PVC Water Main Pipe 600 LF 1.25" HDPE Water Service Pipe 1,330 LF 15" - 18" RCP Storm Sewer Pipe 1,050 LF 4" - 6" PVC Drain Tile 1,370 CY Select Granular Borrow 4,100 SY Geotextile Fabric, Type 5 Non Woven 690 CY Aggregate Base, Class 5 2,050 LF Concrete Curb and Gutter 3,500 SY Bituminous Mixture for Streets, 1.5" and 2" thick 1,815 LF Bituminous Wedge for Plow Protection 1,450 SY 5" Thick Concrete Sidewalk 2 AC Turf Restoration Together with structures, hydrants, valves, fittings, erosion control, restoration and related appurtenances. The provisions of Minn. Stat. 16C.285 Responsible Contractor are imposed as a requirement of this contract. Each bid shall be accompanied by a bidder's bond naming the City of Maple Grove as obligee, certified check payable to the Clerk of the City of Maple Grove or a cash deposit equal to 5 percent of the amount of the Bid, which shall be forfeited to the City in the event that the Bidder fails to enter into a Contract. The City Council reserves the right to retain the deposits of the three lowest bidders for a period not to exceed 30 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The City Council reserved the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract in the best interests of the City. This Project consists of sanitary sewer, water main, house services, storm sewer, street improvements, concrete sidewalk, and concrete sidewalk within the Hennessey Grove Development. Direct inquiries to Eric Seaburg, Bolton & Menk, at 763-732-8751. Final Completion: on or before June 30, 2026
Award
Roads / Highways
$1,003,801.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2025
April 21, 2025
Multiple Locations, Maple Grove, MN
Related To This Project
Maple Grove, MN
--
Maple Grove, MN
Bid Date: Jun 11 2025
Maple Grove, MN
Bid Date: Feb 21 2025
Maple Grove, MN
Bid Date: Feb 20 2025
Maple Grove, MN
Bid Date: Feb 26 2025
Maple Grove, MN
Bid Date: Mar 11 2025
Maple Grove, MN
Bid Date: Mar 06 2025
Maple Grove, MN
Bid Date: Mar 18 2025
Maple Grove, MN
Bid Date: Jan 15 2025
Maple Grove, MN
--
Maple Grove, MN
--
Maple Grove, MN
--
Maple Grove, MN
--
Maple Grove, MN
Bid Date: Jan 21 2025
Maple Grove, MN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.