BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated March 6, 2025

Site work and paving for a bridge / tunnel in Gordonsville, Tennessee. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of March 05, 2025, the project was awarded to Dement Construction, with an awarded amount of $2,079,001.40.** Kemp Hollow Ln. Bridge Over Peyton Creek Project The Owner reserves the right to waive any informalities or to reject any or all BIDS No BID shall be valid unless signed. No BID shall be accepted by fax machine or e-mail. Each BIDDER must deposit with his BID, security in the amount, form, and subject to the conditions provided in the Information for Bidders. Each BIDDER must deposit with his BID, security in the amount, form, and subject to the conditions provided in the Information for Bidders. Each BIDDER shall write on the outside of the envelope containing his Bid (1) his contractors license number, (2) the license expiration date, and (3) that part of the classifi cation applying to the Bid. The Bid will be returned unopened if the above information is not labeled as directed. All companies with fi ve (5) or more employees are also required to comply with the T.C.A. 50-9-113 Drug-Free Workplace Law of 2001. Liquidated damages in the amount designated in the Specifications and Contract Documents will be assessed for failure to complete the work within the contract completion time as specified therein. No BID may be withdrawn within 60 days after the scheduled time for receipt of bids. A. The work to be accomplished under these Specifications consists of the furnishing of all labor, materials, equipment, and services necessary for the construction of a prestressed concrete beam span bridge with piers and abutments, and the demolition and disposal of the existing bridge. The work shall also include clearing and grubbing, traffic control, sediment and erosion control, work zone dewatering, weathered rock removal, structural backfilling, riprap placement, and guardrail construction. All construction is to be coordinated with the Smith County Highway Department. B. The proposed span bridge is to measure 172'-5" in length along the roadway, and 24'-4" in width, measured along the stream. The overall length of the proposed bridge and approach construction is approximately 576'.

Award

Bridges / Tunnels

$2,079,001.00

Public - County

Paving, Site Work

29

11

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
16
Bidding Soon
1,239
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

April 7, 2025

Project location map

Multiple Locations, Gordonsville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.