EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Muskego, Wisconsin. Completed plans call for site work for a educational facility.

St. Leonard School seeks to improve campus security and safety through the procurement of equipment and services as outlined in this Request for Proposal (RFP). We request individual proposals and/or estimates refer to specific project(s) the vendor proposes to serve. Cost proposals for each project item(s) must be clearly stated in your proposal. Upon award vendors will be required to bill each project individually. However, invoices may be submitted concurrently. Perimeter Fencing and Entry Gates Building Location: W173 S7777 Westwood Drive Muskego, WI 53150-9160 Time for Completion: All work is expected to be completed not later than August 22, 2025. This project includes the installation of fencing to enclose the campus. Approximately 2892 linear feet of fencing is required. Vendors may propose one or more style of fence, including fences which may offer a deterrent or be difficult to scale. Fence height may range from not less than 6' to 8.' Vendors should include illustrations or images of proposed style of fence, approximate dimensions, number of posts and installation depth. This project also includes the installation of three (3) entry gates to control the flow of vehicles and pedestrians. Proposals should include the gates and/or manual and electronic operator systems. Any exclusions or additional charges (ie, landscaping, electrical wiring, etc.) should be clearly labeled in the proposal. CONTRACTOR SELECTION: All Contractors shall provide one or more individually formatted and detailed proposal(s) outlining a fixed bid project cost for each project. Respondents may at their discretion include pricing options for additional services or features. Respondents must specify key milestones including an interim or midway check-in point. Proposals will be reviewed and scored according to internal procurement guidelines. Preference will be given to contractors providing discounts, offering favorable payment terms, contractors with prior work experience with the organization, locally based contractors, and contractors with experience including similar or compatible systems which may be readily integrated. Following review of all proposals contractors will be ranked and contacted individually within five business days of the proposal submission deadline. Contractors not responding or unable to provide services by the specified completion date may forfeit the right to project work. Contracts are expected to be finalized by April 15, 2025. PAYMENT PROCESSING : Projects outlined within this request for proposal document are funded through a federal grant. Extended payment terms will be required under the grant. Vendors must provide sen/ices, equipment or products subject to final review and approval by St. Leonard School. Upon completion of work vendor invoices will be submitted for payment. Vendors are advised the State of Wisconsin will review all invoicing and billing materials prior to payment. CONTRACTOR REQUIREMENTS : As a federally funded project all vendors are required to comply with applicable state and federal procurement guidelines found in 2 C.F.R. cc 200.317-200.327. Vendors will be required to complete certification forms related to Boycott of Israel, Immigration & Reform of Control Act, Tax Clearance, and the Policy Regarding Sexual Harassment Acknowledgement. Vendors are also hereby advised to review federal procurement guidelines and regulations related to certain equipment and technology products manufactured or produced in China. A response will be provided acknowledging your attendance. Contractors or respondents with any questions regarding this RFP are welcome to contact Mr. Jeffrey Robb either by phone at: 262-723-1074 or via email jeffrey@ symphonyadvancement.com

Sub-Bidding

Educational

$200,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
115
Bidding Soon
1,939
All Active Projects
967
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

April 14, 2025

img_map_placeholder

w173s7777 Westwood Dr, Muskego, WI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Perimeter Fencing and Entry Gates

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.