Published April 15, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Castanea, Pennsylvania. Completed plans call for site work for a water / sewer project.

The work of this contract will include the replacement of 547 linear feet of sanitary sewer line, bypass pumping,6 sewer lateral connections, cleaning and internal closed-circuit television inspection of 261 linear feet ofsanitary sewer line, traffic control and surface restoration located within the various streets, alley and rights-of-way in the village of Castanea, Clinton County, Pennsylvania.The Owner will furnish any and all materials and supplies needed by the Successful Bidder at no cost to theSuccessful Bidder for the execution of this work. Materials and supplies that can be stockpiled in advance of thework will be stockpiled and stored at the firehall located at 111 McElhattan Avenue. Materials and supplies thatneed to be delivered at the time of installation shall be delivered as needed through the coordination betweenthe Successful Bidder and the Owner.The Successful Bidder shall provide the plant, labor, equipment, tools and supervision to execute the workherein. Compensation to the Successful Bidder defined herein shall be based on the Owner furnishing thematerials and supplies as defined above. Work performed on this Contract will be subject to the prevailing minimum project wage rates as established bythe Pennsylvania Department of Labor and Industry which are described within this Document. Each bid mustbe accompanied by a Certified or Bank Check or Bid Bond naming as payee or obligee, as applicable, Owner, inthe amount of ten percent (10%) of the total amount of the bid as security for proper execution of theAgreement and submitting other documents as required by the Bidding Document.The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, asamended. The Act and amendments require that the Contractor use or furnish only steel products (as defined inthe Act and amendments) which have been produced in the United States. The Successful Bidder will be required to execute the Agreement and to furnish Performance and Paymentbonds, each of said bonds to be in the amount of one hundred percent (100%) of the Contract Price, all in therespective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence ofinsurance coverage as required by the Bidding Documents.All bonds shall be executed by sureties named in the current list, "Companies Holding Certificates of Authorityas Acceptable Sureties in Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570(as amended) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department andshall be acceptable to the Owner.No bids may be withdrawn, except when the Bidder(s) comply with the withdrawal requirements of Act No. 4 ofthe General Assembly of Pennsylvania, Senate Bill 793, Printers No. 1655, as amended.All Bids shall be in a sealed envelope and plainly marked as follows:CASTANEATOWNSHIP BOARD OFSUPERVISORSAttn: Sanitary SewerImprovements BidOpening347 Nittany RoadLock Haven, PA 17745The Owner reserves the right to reject any or all bids or parts thereof or items therein, to waive any defects orirregularities in the Bids, and to accept any Bid which, in its judgement, is for its best interest.Bids shall remain open for a period of sixty (60) days from the date of Bid opening.For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to theInstructions to Bidders that are included in the Bidding Documents. ***Document Note: If hard copies are requested to be sent by Priority Mail, payment forshipping is in the amount of Forty Dollars and No Cents ($40.00). No refund will be given for returned ContractDocuments.

Bid Results

Water / Sewer

$225,494.00

Public - City

Site Work

8

12

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Field Samples, Mockups, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Folding Doors and Grilles, Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Specialty Ceilings, Linear Metal Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Quartz Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furnishing Accessories, Clocks, Furniture, Seating, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Operation and Maintenance of Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Vibration and Seismic Controls for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Operation and Maintenance of HVAC Systems, Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Bases, Ballasts, and Paving, Base Courses, Concrete Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Plastic Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Storm Drainage Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
48
Bidding Soon
608
All Active Projects
274
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

March 19, 2025

img_map_placeholder

Multiple Locations, Castanea, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Sanitary Sewer Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.