BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work and paving for a civil project in San Francisco, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Various Locations Pavement Renovation No. 69 The work to be done under this contract consists of traffic routing, sewer work, water work, and paving work along various locations in San Francisco, California, all as shown on the drawings and as specified in these Specifications. Scope of Work: at various locations in Districts 7 & 8 of San Francisco, California and consists of pavement renovation, curb ramp construction, sewer replacement, traffic control, and all related work. Class "A" license is required to bid. Bid discounts may be applied as per Administrative Code Chapter 14B. LBE Subcontracting Participation Requirement is 25%. For details, contact Queena Chen by phone at (415) 554-0630 or by email at Queena.Chen@sfgov.org Substantial Completion within the time limit of 786 consecutive calendar days. Final Completion shall occur no later than 60 consecutive calendar days after the date of Notice of Substantial Completion. Sewer Work includes, but not limited to: Mobilization and demobilization work; Performing traffic routing and trench support work related to sewer and drainage work; Constructing 12-inch and 15-inch diameter bell and spigot type extra strength vitrified clay pipe (VCP) on crushed rock bedding wrapped in geotextile fabric; Constructing 36-inch diameter Class IV reinforced concrete pipe (RCP) on crushed rock bedding wrapped in geotextile fabric; Line existing 2'-0" x 3'-0" flat-top reinforced concrete (RC) sewer with cured-inplace liner. Cleaning and mortaring manholes; Constructing cast-in-place or precast concrete manholes and catch basins; Constructing 6-inch or 8-inch diameter side sewer connections; Televising existing active side sewers and culverts; Repair, replacement or construction of 6-inch or 8-inch diameter side sewer and 10-inch diameter VCP culverts; Abandoning, removing, and disposing of existing sewers and related structures, where indicated on contract plans; Post-construction TV inspection of newly lined or constructed main sewers, side sewers, and culverts; Furnishing and installing connections to and between sewers, structures, and culverts; Saw cutting, removing, and disposal of existing pavement; Excavation, backfilling and compaction of trench; Restoring concrete base inside and outside of sewer trench limit as necessary per San Francisco Street Excavation Regulations; Bypassing sewer flow from main sewers, side sewers, and culverts during construction; Paving Work includes, but not limited to: Traffic routing work; Excavating, removing and disposing of existing pavement, concrete base, parking strip, curb and sidewalk; Supporting and working around existing utilities; Handling all drainage or ground water; Removing surplus material; Cleaning project site; Furnishing and placing of backfill material; Constructing 2-inch thick asphalt concrete wearing surface over 8-inch thick concrete base, 10-inch thick concrete bus pad, aggregate base Class II for buspad, 4-inch or 6-inch wide concrete curb, 3-1/2-inch thick concrete sidewalk, concrete curb ramps, doweled concrete median or island, and doweled 6-inch wide concrete curb; Adjusting City-owned manhole frame and cover to grade; Adjusting City-owned catch basin frame and grating to grade; Adjusting City-owned castings to grade; Performing all related and incidental work, all where and as shown on the Drawings and in accordance with the Project Manual. Grattan Street: Shrader Street to Cole Street Shrader Street: Alma Street to Rivoli Street Rivoli Street: Shrader Street to Cole Street 17th Street: Stanyan Street to Cole Street Cole Street: 17th St to Carmel Street Roosevelt Way: 17th Street/Uranus Terrace to Lower Terrace Lower Terrace: Roosevelt Way to Levant Street Clarendon Ave: Laguna Honda Boulevard to Bigler Avenue/Twin Peaks Boulevard Burnett Avenue: Parkridge Drive to Crestline Drive Laguna Honda Boulevard: Woodside Avenue to Ulloa Street/Rockaway Avenue Vasquez Avenue: Laguna Honda Boulevard to Woodside Avenue Claremont Boulevard: Portola Drive to Ulloa St/Rockaway Avenue Miraloma Drive: Marne Avenue to Ravenwood Drive/Yerba Buena Avenue Twin Peaks Boulevard: Bigler Avenue/Clarendon Avenue to Clayton Street/Carmel Street 10.4% MBE; 4.8% WBE; 9.8% OBE.

Bid Results

Roads / Highways

$6,718,865.00

Public - City

Paving, Site Work

51

18

93

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
215
Bidding Soon
3,171
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

April 28, 2025

Project location map

Multiple Locations, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.