BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated September 19, 2025

Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project involves the expansion of a 1.92-mile-long,10-foot-wide concrete trail as part of the Howard Peak, Salado Creek Greenway. It will extend from Thousand Oaks to Perrin Homestead, with a connector trail to Kallison Park. Key components of the project include the construction of eleven low-water crossings, the trail will traverse under Thousand Oaks utilizing the existing 10' x 10' box culverts, installation of a multi-span pedestrian bridge over Perrin Beitel, traffic control plan at Perrin Beitel retaining wall, construction of a switchback leading up to Thousand Oaks, bump-outs with enhanced boulders, demolition, and installation of fencing and existing guardrails, proposed CPS gravel access road, installation of mile and quarter-mile markers, wayfinding signs, and 911 locator markers. All landscape will adhere to the tree preservation plan, tree canopy ordinance, existing tree preservation, planting details, irrigation details, and electrical. Question Deadline 02/25/2025 at 4:00 PM CT Renuka.Naidu@sanantonio.gov

Bid Results

Roads / Highways

$6,498,000.00

Public - City

Paving, Site Work

213

24

472

8

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
130
Bidding Soon
2,398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

May 13, 2025

Project location map

Beitel Creek Greenway Trl, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.