BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2025 at 7:00 PM

Updated February 21, 2025

Site work and new construction of a pre-engineered storage facility in Warrensburg, New York. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project work includes but is not limited to provide all labor, materials and equipment necessary to install 6' chain link fence at the park. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a scanned Bid Security in the form of a certified check, bank check, or bid bond in the amount of $4250.00, BONDS The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. The completion date for this project is 180 days after agreement has been approved by the NYS Comptroller's Office. MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISE PARTICIPATION GOALS (MWBE) The following goals for MWBE participation on this project have been established at: Minority Owned Business Enterprise (MBE) 14% Women Owned Business Enterprise (WBE) 16% SERVICE-DISABLED VETERAN OWNED BUSINESS (SDVOB) GOALS The following goals for SDVOB participation on this project have been established at: Service-Disabled Veteran Owned Business 4% PUBLIC BUILDING LAW 8(6) Pursuant to Public Building Law 8(6), any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,628,283 or less (maximum amount has been adjusted for inflation effective January 1, 2024). If more than one responsible and reliable MWBE firm meets the requirements, the MWBE firm with lowest bid will be deemed the apparent low bidder

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$230,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
102
Bidding Soon
1,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 24, 2025

Project location map

Town Dump Rd, Warrensburg, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.