Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a educational facility; and library.

Pursuant to and in compliance with the Construction Manager's solicitation letter dated January 23, 2025 and the Contract Documents (capitalized terms used but not defined herein shall have the meaning assigned thereto in the General Conditions, as defined below) relating hereto, the undersigned (the "Contractor") has submitted a binding offer to furnish the design, all plant, labor, materials, supplies, equipment and all other facilities things, matters and work necessary, proper, or incidental to all work required by and in strict accordance with the applicable provisions of the referenced solicitation documents which include, but are not limited to, the plans, specifications and all of the addenda thereto issued by the Construction Manager and sent to the undersigned by electronic transmission or other appropriate means to the Contractor prior to the date of opening of bids, whether received by the undersigned or not; for the total sum indicated on Appendix A attached hereto in the "Bid Amount" block. The project is located at: 725 East 23rd Street, Brooklyn, NY 11210 (the "Site"). Performance Period The Contractor shall commence Work under this Contract at a date to be specified in a Notice to Proceed (NTP) letter issued by the Construction Manager and, shall complete Work on the Project, on or before 330 continuous calendar days from the date in the Notice to Proceed (NTP). Liquidated Damages The Contractor shall pay to the SCA as liquidated damages the sum of Five hundred ($500) Dollars for each and every continuous calendar day that the Work shall not be completed after the above-stated Completion date or any authorized extension thereof. Bond Requirements (Not Applicable for Mentor Projects) A. In connection with its Bid, the Contractor provided an appropriate bid bond/certified check, in the amount of five (5%) percent of its Bid Amount. B. Contractor has obtained and agrees to maintain in effect for the Performance Period a Construction Performance Bond on the form attached hereto as Appendix D. C. Contractor has obtained and agrees to maintain in effect for the Performance Period a Labor & Materials Payment Bond on the form attached hereto as Appendix E. Question Deadline 02/14/2025 All questions by prospective bidders concerning this solicitation should be directed, in writing to rfimentor@nycsca.org using the project solicitation number in the subject line as indicated in the following example: RFIMENTOR 25-12345D-1 Smith and Jones Construction. however, if you have any additional questions or issues please contact Zaneta Jackman, Contract Administrator at E-mail: zjackman@nycsca.org or at Phone Number: (718)472-8189.

Post-Bid

Library

$500,000.00

Public - City

Renovation

27

26

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Mockups, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework, Wood Paneling
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Air Barriers, Fire and Smoke Protection, Firestopping, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Metal Furring, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Chalkboards, Markerboards, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Runners, Furniture, Seating, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Theatrical Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Material Storage, Storage Equipment and Systems, Storage Cabinets

Find More Local Projects

Within 75 Miles of This Project
530
Active Projects
313
Bidding Soon
5,074
All Active Projects
2,372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

March 21, 2025

img_map_placeholder

725 E 23rd St, New York, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

PS152K - Library Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.