Published March 7, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a 309,156-square-foot, three-story above grade educational facility.

S.E.D. NO. 26-10-01-06-0-007-023 District wide renovations for the Hilton Central School District. Schools included in Project are the High School, Middle School, Northwood Elementary School, Quest Elementary School, and Village Elementary School. CONTRACT TIME The date of commencement of the Work shall be within five (5) calendar days of the date of Notice to Proceed. NOTE: Construction to start Spring 2025. Coordinate schedule with Owner/CM. The Contractor shall achieve Substantial Completion of the entire Work, refer to project schedule for Substantial Completion dates (Specification 010150 - Project Schedule). The OWNER hereby reserves the right to waive any informality and reject any or all bids or to accept the one that, in its judgment, will be in the best interest of the OWNER. BID SECURITY A Bid Security in the amount of five percent (5%) of the Bid must accompany the bid in accordance with the Instructions to Bidders. NONCOLLUSIVE BIDDING CERTIFICATE A non-collusive bidding certificate shall be included on each bid. PREVAILING WAGE RATES This is a prevailing wage rate job. RETURN OF CONTRACT DOCUMENTS Any Bidder, upon returning the Bidding Documents in good condition within thirty (30) days after date set for Bid opening will be refunded their deposit and any Non-Bidder so returning such set will be refunded fifty percent (50%) of his deposit.

Post-Bid

Educational

$30,000,000.00

Public - City

Renovation

182

30

55

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Vapor Retarders, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Window Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Wood Flooring, Resilient Flooring, Resilient Tile Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Other Specialties, Flags and Banners, Flags
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Furnishings and Accessories, Table Accessories, Glassware, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furnishing Accessories, Clocks, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Control-Voltage Electrical Power Cables, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Containment Barriers, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
551
Active Projects
327
Bidding Soon
5,227
All Active Projects
2,452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

July 1, 2025

img_map_placeholder

Multiple Locations, New York, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hilton Central School District Capital Projects 2023 Phase 2A -General construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.