BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2025 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Garland, Texas. Completed plans call for site work for a water / sewer project.

*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. City Of Garland The City of Garland is accepting bids for Bid 0518-25 GP&L College to Brand 138 kV T-Line Construction. Question Deadline 02/13/2025 at 5:00 PM CT This project consists of complete reconstruction of the GP&L 138kV College-Brand (CS-BR) Overhead Transmission Line and Distribution Underbuild as well as demolition of a portion of the College-Jupiter (CS-JU) 138kV Overhead Transmission Line. The construction is located in the City of Garland, Dallas County, Texas within existing easement and public right-of-way. The project is being constructed to improve system reliability and power capacity. CS-BR transmission line reconstruction is approximately 3.96-miles in length and includes demolition of the existing transmission line and structures and installation of new structures with three (3) phases of ACSS/TW 1926.9 kcmil (Cumberland) conductor and one (1) new 96-fiber OPGW shield wire. Forty-one (41) new tubular steel structures will be installed with the CS-BR reconstruction including six (6) on drilled shafts and thirty-five (35) by direct embedment. CS-JU transmission line partial demolition includes removal of existing transmission phase conductors, shield wire, and associated hardware to the limits indicated in the plans. Demolition activities will also include removal and salvage of one gang operated pole mounted air switch and topping of twenty (20) existing timber transmission poles. A total of Forty-one (41) new tubular steel transmission structures will be constructed. All new structures will be self-supporting with either a direct embedded or drilled shaft foundation. The structures will generally support one (1) three phase circuit of 1926.9 ACSS\TW "CUMBERLAND" transmission conductor consisting of one (1) wire per phase. The lines will also accommodate one Centracore 96-Fiber Optical Ground Wire (OPGW), three phase ACSR 477 "HAWK" distribution underbuild circuits where indicated, one 4/0 neutral circuit, and miscellaneous underbuilds, all as shown in the plans and details. CS-BR distribution line construction consists of complete reconstruction of the existing distribution underbuild along two sections of the College-Brand transmission line. Total length of distribution line reconstruction is approximately 2.69-miles and includes demolition of the existing distribution line and structures and installation of new structures with three (3) phases of ACSR 477 kcmil (Hawk) conductor and one (1) new ACSR 4/0 neutral. Sixty-two (62) new tubular steel structures will be installed with the distribution line reconstruction, all by direct embedment.

Bid Results

Water / Sewer

$8,786,872.00

Public - City

Site Work

192

4

15

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
209
Bidding Soon
4,427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 1, 2025

Project location map

Multiple Locations, Garland, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.