BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 19, 2025

Site work and new construction of a pre-engineered storage facility in Benson, Minnesota. Completed plans call for the construction of a 18,200-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

This project includes: A new 18,200sf pre-engineered metal building. Project scope includes but is not limited to building foundations, slab on grade, building structure, exterior skin, doors and fenestration, interior partition walls, mezzanine structure and floors, garage crane and lift, finishes, site work, site utilities and complete mechanical and electrical systems. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Swift County in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before December 12, 2025.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$2,000,000.00

Public - County

New Construction, Site Work

66

28

35

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
16
Bidding Soon
383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

1635 Hoban Ave, Benson, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.