BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work for a water / sewer project in Winfield, Missouri. Completed plans call for site work for a water / sewer project.

OCK and DAM 25 DOWNSTREAM APPROACH GUIDE CELL, U.S. ARMY CORPS OF ENGINEERS, ST. LOUIS DISTRICT Amendment 0001 is to extend the bidder inquiry due date, provide Sign In Sheet, update Wage Determination, release a portion of the Contractor Inquiries and Government Answers to date and related updates. LOCK AND DAM 25 DOWNSTREAM APPROACH GUIDE CELL The proposed project w ill consist of the construction of a DS Guide Cell to support the new 1,200-foot-long lock planned at L&D 25 in Winfield, MO. The DS Guide Cell w ill be approximately 50 ft in diameter and w ill be constructed using cellular sheet pile and founded on 4 ft diameter drilled shafts socketed into bedrock. Steel plates and horizontal corner protection w ill be provided at the barge impact zone regions of the guide cell. The traffic faces of the cell w ill have standard steel w all armor on the portions that are cast-in-place concrete. : Winfield, MO 63389 TYPE: Best Value using Subjective Trade-Off Method COMPETITION : Full & Open Competition TYPE OF CONTRACT: Firm Fixed Price (FFP), Request for Proposal (RFP), Construction (C) Type of contract. ESTIMATED MAGNITUDE in accordance w ith DFARS 236.204 is betw een 10,000,000 and 25,000,000. NAICS Code: 237990 Other Heavy and Civil Engineering Construction w ith a Small Business Size Standard of 45,000,000. Prospective offerors should submit inquiries related to this in writing no later than: 10:00 AM CST, 29 January 2025. All will be submitted in writing via ProjNet Bidder Inquiry at https://www.projnet.org/projnet/binKornHome/index.cfm. Telephone and inquiries will not be accepted. Oral explanations or instructions are not binding. Any information given to an Offeror which impacts the and/or offer will be given in the form of a written amendment to the . Prospective offerors should submit inquiries related to this in writing no later than: 10:00 AM CST, 5 February 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$14,607,000.00

Public - Federal

Site Work

108

27

21

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
58
Bidding Soon
1,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

October 3, 2025

Project location map

To Be Determined, Winfield, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.