EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 14, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Atlantic City, New Jersey. Completed plans call for the renovation of a educational facility.

Bids must be accompanied by a certified check, bank cashier's check, treasurer's check or Bid Bond, with corporate surety satisfactory to the Owner, in an amount not less than 10% of the Base Bid (but in no case in excess of $20,000.00, pursuant to N.J.S.A 18A:18A-24), naming as payee or obligee, as applicable, Atlantic City Board of Education, to be retained and applied by the undersigned as provided in Contract Documents in case bidder would default in executing the Agreement or furnishing the required bonds and insurance certificates as required by Contract Documents. Prospective bidders are advised that this Project is one which will be subject and will be governed by provisions of New Jersey State Law governing (a) Prequalification of Bidders N.J.S.A. 18A:18A-26 et seq., (b) Prevailing Wage Rates N.J.S.A. 34:11-56.27, (c) Use of Domestic Materials, N.J.S.A. 1 to 52:34-4 including any amendments and supplements thereto, and (d) P.L. 1977, Chapter 33, (N.J.S.A. 54:25-24-2) listing corporate/partnership names and addresses for individuals with a share of 10% or more. "The Public Works Contractor Registration Act" became effective on April 11, 2000. No contractor shall bid unless the contractor is registered pursuant to this act. Pursuant to P.L. 2009, c.315 and N.J.S.A. 52:32-44, all business organizations that do business with a local contracting agency are required to be registered with the State and provide proof of their Registration with the New Jersey Department of Treasury, Division of Revenue before the contracting agency may enter into a contract with the business. In addition, and pursuant to N.J.S.A. 18A:18A-25, each bid must be accompanied by a certificate from a surety company stating it will provide said bidder with a bond in such sum as required by the above referenced statute. No proposals may be withdrawn for a period of 60 days after the date set for opening of bids. Right is reserved to waive minor irregularities and to reject bids pursuant to N.J.S.A. 18A:18A-22. Bidders must comply with the requirements of P.L. 1975, Chapter 127, N.J.A.C. 17:27 Laws Against Discrimination and NJSA 10:5-31 et seq.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

35

13

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Support Assemblies, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders, Flashing and Sheet Metal, Roof and Wall Specialties and Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Gypsum Board, Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Piping Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
92
Bidding Soon
1,343
All Active Projects
645
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

March 31, 2025

img_map_placeholder

411 N New York Ave, Atlantic City, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New York Avenue School HVAC System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.