BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2025 at 7:00 PM

Updated February 18, 2025

This is a service / maintenance or supply contract in Bottineau, North Dakota. Contact the soliciting agency for additional information.

The District designated Professional Engineer Jennifer Malloy and Apex Engineering as the Districts engineer for the proposed Project, and pursuant to their appointment, Engineer Malloy and Apex Engineering prepared and filed an engineers report showing the profiles, plans, and specifications for the proposed Project (Engineers Report), a map of the lands to be drained by the proposed Project, and an estimate of the total cost of the proposed Project and filed the same with the District; and WHEREAS , the District approved the starting point, general course, and terminus of the proposed Project more specifically described as follows: The starting point of the proposed Project main channel construction shall be at the existing drain/watercourse located near boundary between the Northwest Quarter of the Northwest Quarter (Lot 4) and the Southwest Quarter of the Northwest Quarter of Section 2, Township 160 North, Range 79 West (Tacoma Township), then continuing northeasterly across the Northwest Quarter of the Northwest Quarter (Lot 4), then easterly into the Northeast Quarter of the Northwest Quarter (Lot 3) of said Section 2, until terminating just east of the west boundary of said Northeast Quarter of the Northwest Quarter (Lot 3) of said Section 2, Township 160 North, Range 79 West (Tacoma Township), all in Bottineau County, North Dakota. There shall be a side channel to the main channel of the proposed Project, the starting point of which is approximately three hundred and thirty feet (330) southeasterly of the main channel and is located in the Southwest Quarter of the Northwest Quarter of Section 2, Township 160 North, Range 79 West (Tacoma Township), then draining northwesterly across said Southwest Quarter of the Northwest Quarter until it confluences with the main channel just north of the north boundary line of said Southwest Quarter of the Northwest Quarter of said Section 2, Township 160 North, Range 79 West (Tacoma Township), all in Bottineau County, North Dakota; and WHEREAS, the District determined, by inspection by and through Engineer Malloy and Apex Engineering, the particular lots and parcels of land which, in the opinion of the District, would be especially benefited by the construction of the proposed Project, certifying the same through a proposed assessment list that shows the percentage assessment against each parcel of land benefited by the proposed Project and the approximate assessment in terms of money apportioned thereto; and WHEREAS , the District found that the total cost of acquiring rights-of-way and constructing the proposed Project apportioned to each benefited lot and parcel in the proposed assessment list is not exceeded by the benefits to each lot and parcel; and WHEREAS ,

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
12
Bidding Soon
153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

March 19, 2025

Project location map

Multiple Locations, Bottineau, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.