BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and paving for a road / highway in Ridgecrest, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of December 5 , 2025, a general contractor has been awarded. Construction began in April 2025 and is expected to be completed in summer 2026. The approximately 37-acre project site is in the Greater Ridgecrest area, with a 5-acre stormwater pond located in the northwest corner. The area is bordered to the west by McKay Creek, to the south by undeveloped Pinellas County property, to the north by Ridgecrest Park and to the east by 119th Street North and residential properties. Currently, the site topography is not level, with the southwest side approximately 12 feet higher than the east. The site is currently used for overflow parking during some events. The objectives of this project are to regrade the site and install a gas mitigation system to support reuse of the former disposal area as a future greenspace. This project is included in the county's 2025-2030 Capital Improvement Program (CIP). *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Roads / Highways

$6,789,299.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
113
Bidding Soon
1,783
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

119th St N, Ridgecrest, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.