Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 27, 2025 at 7:00 PM
Updated February 28, 2025
Site work and paving for a road / highway in Chicago, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
No bids will be accepted after time on the scheduled bid opening date. All bids faxed, mailed, emailed, or hand delivered will not be considered and will be returned to the Bidder. There is no bid depository safe available for mailing or hand delivering bids. The District will only accept bids electronically. Bids will be deemed non-responsive if not submitted using the project-online provided by the District with the bidding documents. Tenders are invited to provide all materials, labor, supervision, tools, equipment, vehicles, and appurtenances, including transportation, necessary to perform roadway preparation (clearing and brooming) and bituminous seal coating, at the Prairie Plan Site in Fulton County, Illinois, for a period beginning upon approval of the Contractor's Bond and ending on or before December 31, 2025. The seal coat shall not contain coal tar or polycyclic aromatic hydrocarbons (PAHs). The estimated cost of this Contract is not to exceed $60,000.00. The District assumes no liability or responsibility for the failure or inability of any Bidder to successfully obtain any and all Contract documents, including but not limited to specifications, Proposal forms and/or plans, as a result of any type of technological computer and/or software system failure or breakdown that restricts, prohibits or prevents successful obtaining of any and all District Contract documents by the Bidder, whether caused by the District or other parties, directly or indirectly. The District intends to obtain as much work as possible without exceeding the above stated values. However, Bidders are cautioned that, due to unforeseen operating conditions, the full amount may not be expended. There is no bid deposit required for this Contract. The successful Contractor agrees to furnish a Contractor's bond, as a Contractor's bond will be required. Please refer to the CONTRACTOR'S BOND section in the Agreement of this Contract document, for additional information about this requirement. Question Deadline 02/18/2025 The District will only respond to questions received online up to ONE (1) WEEK prior to the bid opening date of the bidding documents. The District will not respond to questions received after this date. The District does not guarantee the timeliness of responses provided online, nor does the District guarantee that such responses will be provided in adequate time to affect the submission of bids. The District shall provide responses online ONLY if the responses do not interpret or otherwise change the bidding documents. The District's responses online are NOT official responses and, therefore, are not binding to the bidding documents. Any official interpretation or change to the bidding documents will be made only by addenda duly issued to all plan holders on record by the Director of Procurement and Materials Management. Failure on the part of the prospective Bidder to receive a written interpretation prior to the time of the opening of bids will not be grounds for withdrawal of proposal. The contact person for this Contract is Mr. Raphael Frost. Mr. Frost will provide online responses to online inquiries. Bidders should read the bidding requirements set forth on pages R-1 through R-6, and in particular page R-2, Paragraph 6, in regards to questions on this Contract. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/0.01 et seq.)(the "Act"). Note that submission of certified payroll records when requested by the District's Affirmative Action Administrator in accordance with Section 14(b) of the District's Affirmative Action Ordinance does not relieve a Contractor of its obligation to submit certified payroll records to the Illinois Department of Labor pursuant to the Act. The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all Proposals.
Bid Results
Roads / Highways
$51,105.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2025
March 27, 2025
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Mar 07 2025
Chicago, IL
Bid Date: Feb 28 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Mar 04 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Feb 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
