EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 4, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Bourbonnais, Illinois. Completed plans call for site work for a playground / park / athletic field; for paving for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of February 20, 2025, this project has not yet been awarded. The project is expected to be awarded on Monday. BOURBONNIAS TOWNSHIP PARK DISTRICT is requesting Sealed Bids for the proposed Perry Farm Bike Path Improvements Sealed Proposals for the improvements Proposed Improvements: Removal and Installation of Fencing, PCC Bike Path, Storm Sewer, Earth Excavation, Turf Restoration and Pavement Markings Prevailing Wage Rates Apply For the improvement of the above section by the construction of Existing Fence removal. New Fence Installation, Construction of PCC Bike Path, Storm Sewer Earth Excavation, Turf Restoration and Pavement Markings per plan

Award

Playgrounds / Parks / Athletic Fields

$285,885.00

Public - City

Paving, Site Work

6

8

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
101
Bidding Soon
2,130
All Active Projects
930
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

March 19, 2025

img_map_placeholder

459 Kennedy Dr, Bourbonnais, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Perry Farm Park Bike Path Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.