BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work and paving for a mixed-use development in Middleton, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work includes the reconstruction of: Parmenter Street between Century Avenue and Greenbriar Road. The roadway is planned to be widened and urbanized with curb and gutter throughout the corridor. Bike lanes, bike paths, and sidewalks are included within the project. Stormwater management is required for the project and included within the project limits. Minimal water main and sanitary sewer improvements are required within the project. Public coordination and staging of construction will be required to allow for access to the properties along the corridor. Lighting, pavement marking, landscaping and restoration will all have elements within the project. The City is flexible on scheduling this work, intended to be pursued sometime between June 2025 and being completed in September 2025. It is anticipated once work begins, Contractors will be present to continue work on the project until completion is reached. Work should be coordinated to allow traffic during all events such as Good Neighbor Festival Weekend planned for August 22nd through the 24th of 2025. Please contact Online at (952) 233-1632 or Online for assistance in free membership registration, downloading, and working with this digital project information. The online bid form is also accessed through the Online website. There will be no pre-bid conference for this project. No Bid will be received unless accompanied by a surety in a form acceptable to the City equal to at least 5% of the maximum Bid, payable to the OWNER. See Instructions to Bidders on City website for details. The City of Middleton reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids (consisting of up to: 60 days for issuance of Notice of Award; 15 days for Contractor to return signed agreements, bonds and insurance; and 10 days for City execution of agreement). The project is funded in part by the Wisconsin Department of Transportation Local Road Improvement Program (LRIP). Contract award shall be made based on the lowest responsive and responsible Bidder.

Award

Roads / Highways

$3,183,745.00

Public - City

Paving, Site Work

107

28

36

8

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
125
Bidding Soon
1,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

June 2, 2025

Project location map

Parmenter St, Middleton, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.