Published February 4, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a museum in Rocky Mount, North Carolina. Completed plans call for the renovation of a museum.

Imperial Center Roof Replacement The City of Rocky Mount Reserves The right to Reject Any and All Bids. The City of Rocky Mount Will Not Discriminate against Any Bidder Submitting a Bid Because of Race, Creed, Color, National Origin or Handicap. Question Deadline 02/13/2025 at 4:00 PM ET The City of Rocky Mount is Seeking 10%minority Business Participation on This project. Work under this Contract consists of furnishing all labor, materials and equipment necessary to perform specified roof replacement and wall repairs at the Rocky Mount Imperial Center Complex, 270 Gay St. and 367N. Franklin Street, Rocky Mount, NC, 27802 as described in these specifications. The work will include, but is not necessarily limited to, the following: 1.1.1.1 Roof Replacement: (a) Water test all roof drains prior to any work and report any blockages or other impediments to drainage to Owner and Designer. (b) At location identified as Roof Replacement: Remove the existing roofing and roof insulation down to the deck, and discard. Observe deck for damage, including termite damage inform designer of record if damage is beyond the scope of design documents. (c) At locations identified as Roof Recover: Prepare existing assembly for new coverboard, membrane, and flashings. Remove existing assembly down to the deck at areas identified to contain moisture. (d) Remove all existing membrane flashings, metal flashings, and miscellaneous items, and discard. (e) Remove all existing drain strainers and clamping rings. (f) Replace any deteriorated wood nailers or deteriorated deck. (g) Furnish and install new wood nailers at the perimeter to accommodate the height of the new insulation. (h) Cut through wall scuppers in new wood nailers. (i) Furnish and install new drain strainers and clamping rings. (j) Furnish and install new pipe supports and paint gas lines. (k) Furnish and install new Roof Replacement and Roof Recover systems as identified on the Roof Assembly Charts on the drawings. (l) Furnish and install new fully adhered PVC membrane. (m) Furnish and install new membrane walkway pads. (n) Furnish and install new membrane flashings and metal flashings. (o) Furnish and install new counterflashings, edge metal and coping. (p) Water test all roof drains after new roof system installation is complete. Roof drains shall be plugged above the connection to the drain pipe and flood tested to test the connection of the new roof membrane to the drain. (q) Furnish and install any miscellaneous items. Wall Repairs: (a) Tuckpoint all deteriorated masonry joints. (b) Remove and replace damaged, cracked, or spalled bricks. (c) Install sealant at three sides of metal shrouds over louvers and at perimeter of mechanical units mounted on the wall. 1.1.1.3 Termite Damage Repairs (denoted as Termite Damage Areas 1, 3, 4 on drawings): (a) Remove damaged roof deck noted on drawings or remove damage deck observed during roof removal. (b) Inform designer of record of termite damage beyond the scope of what is shown

Post-Bid

Museum

$150,000.00

Public - City

Renovation

12

12

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Thermal Protection, Exterior Insulation and Finish Systems, Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
930
All Active Projects
385
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

March 6, 2025

img_map_placeholder

270 Gay St, Rocky Mount, NC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Imperial Center Roof Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.