Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2025 at 7:00 PM
Updated February 26, 2025
Site work for a water / sewer project in De Pere, Wisconsin. Completed plans call for site work for a water / sewer project.
Project 25-03 for which proposals are being sought includes the following approximate quantities: 9,000 LF of 8"-15" Sanitary Sewer Cured in Place Pipe 350 LF of 54" Storm Sewer Cured in Place Pipe 160 LF of Televising Sanitary Laterals. Each proposal shall be accompanied by a bid bond in an amount equal to five percent (5%) of the bid, payable to the City of De Pere, as a guarantee that if the bid is accepted, the bidder will execute a contract and furnish a contract bond as set forth in the General Conditions of the City of De Pere. In case the bidder fails to file such contract and bond, the amount of the bid bond shall be forfeited to the City of De Pere as liquidated damages. The letting of the contract is subject to the provisions of the following Wisconsin Statutes: Section 62.15 regarding Public Works. Section 66.0901(3) regarding Prequalification of Contractor. Each bidder shall pre-qualify by submitting proof of responsibility on forms furnished by the Director of Public Works. Such forms shall be filed with the Director of Public Works no later than 4:00 PM, Monday, February 17, 2025. Prospective bidders who have previously submitted such forms subsequent to January 1, 2025 will not be required to separately submit such forms for this project. The City of De Pere reserves the right to reject any or all bids, to waive any informalities in bidding and to accept any proposal which the Common Council deems most favorable to the interest of the City of De Pere. Question Deadline 02/10/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered. A. Project Identification 1. Project Location a. Lande Street - Sixth Street to 500' E/O Sixth Street b. Marsh Street - Fourth Street to Third Street c. N. Adams Street - George Street to Irwin Avenue d. Alley - Superior/Michigan - Morris Street to Ridgeway Boulevard e. Easement - Morris/Ridgeway - Michigan Street to Superior Street f. Aldrin Street - Suburban Drive to 500' E/O Suburban Drive g. Alley - Oakdale/Lawton - Randall Avenue to Termini h. Easement - Oakdale/Lawton - Randall Avenue to Ridgeway Boulevard i. St Anthony Drive - Suburban Drive to 500' E/O Suburban Drive j. Webster Avenue - 590' N/O Chicago Street to 150' N/O N Summer Range Road k. 807 N Broadway - Fox River to N Broadway Street l. 823 N Broadway - Fox River to N Broadway Street m. Grant Street - 300' W/O S Sixth Street to S Sixth Street n. Good Hope Road - Fox River Drive to 1500' E/O Fox River Drive o. Broadway/Ridgeway - Fox River to North Broadway Street p. South Clay Street - 600' South of Charles Street to 850' South of Charles Street 2. Work will be performed under the following prime contract: a. Project 25-03 Sewer Lining B. The Work includes: 1. Sewer cleaning and material disposal 2. Sewer televising 3. Televising sanitary laterals 4. Bypassing (where applicable) 5. Pipe lining preparation including protruding tap, mineral build-up and root removal. 6. Pipe lining - CIPP 7. Final sewer televising and cleaning 8. Modifications to structures for access if required. 9. Traffic Control This project includes multiple interim dates that are critical to the project. 1. Storm sewer lining at 807 N. Broadway and sanitary sewer lining at 807 N. Broadway and 823 N. Broadway are to be completed between May 20th and June 15th. This work is occurring immediately after the storm sewer work and manhole adjustments being completed under Project 25-01 as discussed in Section 1.7. Sewer lining will be allowed to occur concurrently if approved by the contractor completing 25-01. 2. Alley - Oakdale/Lawton - Randall Ave to Termini. Work is being completed under Project 25- 02 as discussed in Section 1.7. This work will be completed by August 1, 2025. 3. Easement - Oakdale/Lawton - Ridgeway Boulevard to Randall Ave. Work is being completed under Project 25-02 as discussed in Section 1.7. This work will be completed by August 1, 2025.
Bid Results
Water / Sewer
$530,264.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
March 24, 2025
Multiple Locations, De Pere, WI
Related To This Project
De Pere, WI
Bid Date: Feb 20 2025
De Pere, WI
Bid Date: Feb 28 2025
De Pere, WI
Bid Date: Mar 12 2025
De Pere, WI
Bid Date: Mar 04 2025
De Pere, WI
Bid Date: Mar 07 2025
De Pere, WI
Bid Date: Mar 12 2025
De Pere, WI
Bid Date: Mar 12 2025
De Pere, WI
Bid Date: Apr 08 2025
De Pere, WI
Bid Date: Feb 20 2025
De Pere, WI
Bid Date: Feb 20 2025
De Pere, WI
Bid Date: Jan 30 2025
De Pere, WI
Bid Date: Jan 30 2025
De Pere, WI
Bid Date: Jan 31 2025
De Pere, WI
Bid Date: Jan 30 2025
De Pere, WI
Bid Date: Jan 07 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.