BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Site work and paving for a civil project in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The installation of a 10' wide concrete trail along the lower shelf of Brays Bayou. The trail consists of two segments. One being from N. Braeswood Blvd. to Hilcroft Ave. and the other from Chimney Rock Rd. to S. Rice ave. Total linear feet of both trails is approximately 6,173 linear feet. Construction in, on, or near existing roadways will require a Traffic Control Plan. Construction also requires the implementation of Storm Water Pollution Prevention Plan and features. Disposal of any excess material and debris is the responsibility of the contractor. All disturbed areas are to be hydromulch seeded as indicated on plans. The deadline to ask questions is 2/20/2025 5:00 PM CST A cashier's check or Bid Bond in the amount of 10% of the total bid amount must accompany each bid. The successful bidder will be required to provide a performance bond and payment bond as provided for in the bid documents, for the full amount of the contract. The Owner reserves the right to reject any or all bids. No bid may be withdrawn until the expiration of 60 days from the date bids are opened. MWSBE Goal: _24%_ percent, where SBE can make up to 4% of the goal.

Post-Bid

Roads / Highways

$1,031,687.00

Public - City

Paving, Site Work

26

20

8

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
4
Bidding Soon
1,996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

May 5, 2025

Project location map

Brays Bayou Greenway Trl, Houston, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.