Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 7, 2025 at 8:00 PM
Updated October 8, 2025
Demolition, site work, new construction, renovation and addition to an educational facility in Crump, Tennessee. Completed plans call for the addition of a 7,238-square-foot educational facility; for the demolition of a educational facility; for site work for a educational facility; for the construction of a 14,818-square-foot, one-story above grade educational facility; and for the renovation of a 3,200-square-foot educational facility.
As of October 07, 2025, this project has not yet been awarded. A timeline for award has not yet been established. TSBC Number 166/084-01-2023: This project consists of the construction of a new one story, 14,818 SF building providing classrooms, lab space, offices, and storage areas. Order This project consists of the construction of a new one story, 14,818 SF building providing classrooms, lab space, offices, and storage areas. This is classified as an S-1/B Mixed Occupancy. The construction is primarily a load bearing CMU wall with steel bar joists and a brick veneer façade. A 7,238 SF addition of a one story multi-purpose room classified as an A-3 Occupancy. Construction type is a steel post and beam structure, with brick veneer and architectural mesh cladding. A 1,900 SF open air pole barn classified as a U Occupancy building. A 3,200 SF interior renovation in the existing Admin. Building for a Cosmetology classroom and renovation of the main entrance. The work shall include all civil, landscape, architectural, structural, mechanical, plumbing, fire alarm and electrical work, and the following: Additionally, the General Contractor shall ensure to include the following as a part to the Work: All utilities as required for building operation both from inside the building to 5'-0" outside the building, and from 5'-0" outside the building to the appropriate main service line as coordinated with utilities provider or other applicable city officials. This includes tap fees, meters, connections, electrical transformer and pad (as required), and all other Work related to utility provision and installation as required for complete operation. Question Deadline 08/28/2025 Questions shall be received by Designer at least six calendar days before bid opening date.
Bid Results
Educational
$8,522,380.00
Public - State/Provincial
Addition, Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
November 3, 2025
3070 US-64, Crump, TN
Related To This Project
Crump, TN
Bid Date: Apr 09 2025
Crump, TN
Bid Date: Jul 16 2025
Crump, TN
Bid Date: Aug 27 2025
Crump, TN
Bid Date: Nov 10 2023
Crump, TN
Bid Date: Nov 15 2023
Crump, TN
Bid Date: Aug 21 2023
Crump, TN
Bid Date: Aug 01 2023
Crump, TN
Bid Date: May 03 2023
Crump, TN
Bid Date: Feb 20 2023
Crump, TN
Bid Date: May 03 2023
Crump, TN
Bid Date: Sep 28 2022
Crump, TN
Bid Date: Apr 27 2022
Crump, TN
Bid Date: Mar 18 2022
Crump, TN
Bid Date: Dec 14 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
