BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work, paving and renovation of a civil project in Rosenberg, Texas. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Estimate: $6,000,000 The deadline to ask questions is 2/21/2025 11:00 AM CST The work consists of providing the necessary labor, material, equipment, and supervision to construct Fort Bend County MUD No. 184 Wastewater Treatment Plant Expansion to 0.35 MGD & Stonecreek Lift Station No. 1 Improvements for Fort Bend County Municipal Utility District No. 184. At Stonecreek Lift Station No. 1: The site work contractor is responsible for bypass pumping; demolition of existing pumps, riser piping, guide rails and pipe supports; rehabilitation and coating of the wet well walls and top slab; installation of three (3) submersible pumps with base elbow, guide rails and all accessories (pumps, base elbow, guide rails and accessories supplied by Lessor); riser piping, yard piping and valves; storm water pollution prevention facilities; lift station control panel modifications; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning lift station. The lessor is responsible to supply the three (3) proposed submersible pumps with base elbow, guide rails and all accessories to be installed by the site work contractor. At the Wastewater Treatment Plant: The site work contractor is responsible for all site work, including but not limited to clearing and grubbing of the site; demolition of portions of existing chain link fence; construction of new chain link fence; yard piping, manholes; site work; crushed concrete roads and IWTP pad; protective coatings, concrete pads; site grading, swales, storm piping, culverts, inlets and storm outfall; concrete foundations for elevated steel headworks (supplied and installed by Lessor); above ground piping and valves at the elevated headworks; 400A disconnect at existing service rack; new service rack and supports; SPD; LPA; lighting contactor panel; transformer; disconnects; autodialer; site lighting; electrical manholes; underground duct banks with wires and conduits; modifications to the existing PLC panel at the rack; grounding; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. The leased facilities include the delivery and assembly of the elevated steel headworks (structure, stairs, weirs, screen, drying rack, handrails, accessories, lighting, and electrical items)(concrete pier foundations and concrete stair landing by site contractor); the 190,000 gallon per day interim package wastewater treatment plant facilities including delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifier; chlorine contact basin; tertiary filters non-potable water system; chlorine disinfection equipment and disinfection equipment building; eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the tertiary filters, blowers, clarifier, non-potable water system, disinfection equipment and effluent flow measurement; basin lighting, and all other electrical plant devices; and electrical wiring; and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the lease scope is all the plant related functions from the stub up for the force main piping upstream of the elevated headworks manual bar screen and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between with the exception of underground portion of the screened influent piping between the headworks and Train No. 3. The installation of the leased facilities shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. At the leased facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the leased facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed leased facilities. All buried piping shall be installed with a flanged stub-up approximately 12-inches (12") above finished grade at all locations. The site work contractor is responsible for any underground duct banks and underground conduit between leased local control panels and leased field equipment unless stated otherwise on the plans. The lessor is responsible for all wiring between the leased local control panels and leased field equipment and for all above ground conduit between the leased local control panels and leased field equipment unless stated otherwise on the plans. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules.

Bid Results

Water / Sewer

$5,437,279.00

Public - County

Paving, Renovation, Site Work

72

22

6

7

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
200
Bidding Soon
3,348
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

April 25, 2025

Project location map

Multiple Locations, Rosenberg, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.