EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 18, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, new construction, renovation and addition to an educational facility in Spanish Fork, Utah. Completed plans call for the addition of a 18,700-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and 18,700-square-foot, two-story above grade educational facility.

Nebo School District (the School District) is accepting Statements of Qualifications (SOQ) from qualified and licensed General Contractors (the General Contractors) for the school building addition at Maple Mountain High School located in Spanish Fork, Utah (the Project). The Project is a two-story classroom addition with approximately 18,700 new square feet. There will be a total of 13 new classrooms including 10 typical classrooms, 1 ceramics lab, and 2 science classrooms. The exterior design will include split face and smooth face CMU as well as storefront systems and metal panel wall systems. The addition was planned for in the original design and will be an extension to an existing classroom wing. Site work will include adjustments to an existing parking lot and tying into existing underground utilities to accommodate the requirements of the new addition. A new sewer connection from the addition to the street will also be required. Landscape around the addition will be planted in sod with remodel to existing irrigation systems as needed to accommodate the new addition's footprint. New sidewalks will be included that tie the new addition into the existing site circulation. The structural system for the addition will include load bearing CMU, steel framing, concrete footings, and a suspended concrete floor over composite deck and steel framing. The HVAC heating and cooling system will tie into the existing hot water and chilled water system. A new custom air handler located on the roof will serve the new addition. This project aims to seamlessly integrate the new classroom addition into the existing Maple Mountain High School infrastructure by expanding current systems including fire sprinkler, electrical distribution, fire alarm, intercom, telecom, security and audiovisual systems. The design will be aligned with Nebo School District standards. The estimated cost of this Project is around nine million. General Contractors submitting a SOQ are cautioned not to contact members of the Evaluation Committee, the Board of Education, or District Administration personnel, other than the designated contact person designated below, throughout the RFSOQ process as of the date hereof. Failure to comply with this requirement may result in disqualification from consideration. Contact for RFSOQ Clarifications: Ryan Pitcher, District Chief Procurement Officer Nebo School District 350 South Main Spanish Fork, Utah 84660 Telephone No. 801-354-7433 Email: ryan.pitcher@nebo.edu Nebo School District reserves the right to reject any or all SO Any questions must be posted in UP3/SciQuest so that all vendors have access to the same information Question Submission Close Date 2/13/2025 2:00 PM MST

Post-Bid

Educational

$9,000,000.00

Public - County

Addition, Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
42
Bidding Soon
524
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

April 18, 2025

img_map_placeholder

51 N Spanish Frk Pkwy, Spanish Fork, UT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

General Contractor Services Maple Mountain High School Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.