Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Site work for a water / sewer project in Bennington, Vermont. Completed plans call for site work for a water / sewer project.
Phase II of the Front Line Rearing Pond improvements and will consist of constructing new concrete training walls around Ponds #2, 3 and 4, and replacing concrete water level control structures/flumes between ponds 2/3 and 3/4 and tying new Pond 4 training walls back to the existing level control structure at outlet of Pond 4. The new Pond #2 walls will tie to the Phase I concrete Flume outlet wing walls. The new concrete water level control structures/flumes will each include a new drain to be connected to the main drainline for the hatchery facility. The new concrete training walls, replacement water level control structures/flumes and drain lines are to improve operations and maintenance of the ponds. The project will also include erosion prevention and sediment control measures, control of water, piping, valves, earthwork and all other appurtenances and incidental work necessary to complete the project. Plans indicate Not in Contract (N.I.C) for elements that were part of Phase 1 construction or are otherwise excluded from the scope.
Bid Results
Water / Sewer
$669,383.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2025
June 15, 2026
To Be Determined, Bennington, VT
Related To This Project
Bennington, VT
Bid Date: Mar 27 2025
Bennington, VT
Bid Date: Apr 03 2025
Bennington, VT
--
Bennington, VT
Bid Date: Apr 08 2025
Bennington, VT
--
Bennington, VT
Bid Date: Jun 30 2025
Bennington, VT
Bid Date: Jul 30 2025
Bennington, VT
Bid Date: Oct 10 2025
Bennington, VT
Bid Date: Feb 28 2025
Bennington, VT
Bid Date: Jan 31 2025
Bennington, VT
--
Bennington, VT
--
Bennington, VT
--
Bennington, VT
--
Bennington, VT
Bid Date: Dec 19 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
