EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work for a water / sewer project in Bennington, Vermont. Completed plans call for site work for a water / sewer project.

Phase II of the Front Line Rearing Pond improvements and will consist of constructing new concrete training walls around Ponds #2, 3 and 4, and replacing concrete water level control structures/flumes between ponds 2/3 and 3/4 and tying new Pond 4 training walls back to the existing level control structure at outlet of Pond 4. The new Pond #2 walls will tie to the Phase I concrete Flume outlet wing walls. The new concrete water level control structures/flumes will each include a new drain to be connected to the main drainline for the hatchery facility. The new concrete training walls, replacement water level control structures/flumes and drain lines are to improve operations and maintenance of the ponds. The project will also include erosion prevention and sediment control measures, control of water, piping, valves, earthwork and all other appurtenances and incidental work necessary to complete the project. Plans indicate Not in Contract (N.I.C) for elements that were part of Phase 1 construction or are otherwise excluded from the scope.

Award

Water / Sewer

$186,275.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
121
Bidding Soon
1,566
All Active Projects
646
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

June 2, 2025

img_map_placeholder

To Be Determined, Bennington, VT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.