Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
Site work and paving for a mixed-use development in Midway, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Construction of the North Center Street Trail, Water and Sewer Improvements Project .PROJECT DESCRIPTION:oInstall 8" Slip Line Fold & Form sewer line and lateral connections (approximately 1,000 lineal feet along North Center Street from Burgi Lane to Alfalfa Circle and approximately 300 lineal feet near 65 North 300 East). Includes restoration of surface improvements in impacted areas. oInstall approximately 3,550 lineal feet of 10" PVC C900 DR-18 water line, approximately 250 lineal feet of 8" PVC C900 DR-18 water line, and service connections along North Center Street from 600 North to Main Street and along Alfalfa Circle. Includes restoration of surface improvements in impacted areas. oComplete roadway improvements along North Center Street from 600 North to Main Street. Includes pulverizing existing asphalt, grading and compacting subgrade, repaving the roadway, and restoration of surface improvements in impacted areas. oConstruct approximately 6,500 lineal feet of multi-use trail along the east side of North Center Street from Main Street to Burgi Lane. The trail construction will include excavation, grading, and surfacing to create a stable path suitable for pedestrians, cyclists, and other non-motorized traffic. Safety enhancements such as trail separation from the roadway, curb and gutter adjustments, and the installation of rumble strips will be implemented. Includes restoration of surface improvements in impacted areas. Cashier or Certified check or bid bond made payable to Midway City in an amount equal to at least five percent (5%) of the total amount of the bid. Bid bonds must be under written by a Surety Company approved by the U.S. Department of the Treasury. Midway City reserves the right to accept or reject any or all proposals, or any part of any proposal, including the right to waive any informality in any part of any proposal within the best interest of Midway City.
Bid Results
Sidewalks / Parking Lot
$2,675,675.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
March 24, 2025
N Center St, Midway, UT
Related To This Project
Midway, UT
--
Midway, UT
Bid Date: Mar 20 2025
Midway, UT
Bid Date: Apr 09 2025
Midway, UT
Bid Date: Jul 08 2025
Midway, UT
Bid Date: Apr 28 2021
Midway, UT
Bid Date: Sep 11 2025
Midway, UT
Bid Date: Oct 21 2025
Midway, UT
--
Midway, UT
Bid Date: Aug 14 2024
Midway, UT
Bid Date: Jul 31 2024
Midway, UT
--
Midway, UT
Bid Date: Feb 15 2024
Midway, UT
Bid Date: Dec 20 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
