BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work for a playground / park / athletic field in Wake Forest, North Carolina. Completed plans call for site work for a playground / park / athletic field.

**As of May 8, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The Town of Wake Forest is soliciting a Request for Qualifications from firms or teams qualified to design, produce bid documents, and oversee the construction of a Tennis Court Complex. The selected firm will have proven experience and knowledge in project management and design. Anticipate this project starting by June 1, 2025, with a deadline for completion on September 1, 2025. Courts will be closed to the public during this time. The contents of this qualification package are as follows and shall be submitted in the following order: A. Project lead must have supervised five (5) previous tennis court enhancements/construction projects, three (3) of which must be turn-key projects containing the entire scope of work listed below. Each of the project summaries shall include the following: 1. Description of the project, including size and scope. 2. Degree of involvement for the Project Lead. 3. Project references including current names, addresses and telephone numbers. B. Name and qualifications (related to this project) of sub-contracted companies being used for this project. C. Warranties: Provide any warranties for work and materials installed. D. Project schedule. 1. It is the desire of the Town to complete this project no later than September 1, 2025. 2. Provide a project schedule, detailing plans to complete this project within the specified period. E. Project Scope to include but is not limited to: 1. Design of tennis court replacement, including fully engineered and approved construction plans, building permits, and any other applicable approvals. 2. Removal / Replacement of existing courts. 3. Addition of a restroom / storage facility. E. Attend a kick-off meeting with Town staff at the outset of the planning process. F. Provide a file sharing service. G. Meet with Town staff to review draft documents to ensure that the project is consistent with the scope of services. H. Provide briefings to Parks staff via e-mail with summaries of activities, progress and obstacles Question Deadline: 02/19/2025 at 3:00 PM ET Randy Driver, rdriver@wakeforestnc.gov

Award

Playgrounds / Parks / Athletic Fields

$1,220,350.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
126
Bidding Soon
1,617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

June 1, 2025

Project location map

1226 N White St, Wake Forest, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.