Published February 24, 2025 at 7:00 PM
Updated February 25, 2025
Demolition, site work, paving and new construction of a mixed-use development in Chicago, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of February 24, 2025, award not expected until April 2025. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 23, 2025 at 10:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for Flossmoor Road and 183rd Street bridge structures over I-57. The Consultant's work is expected to consist of preparing contract plans, specifications, and estimates for bridge deck replacement of Flossmoor Road bridge and bridge replacement for 183rd Street over I-57. The Consultant's work may include supplemental topographic survey, and geotechnical work, as well as all other tasks as determined by the department. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) The estimated construction cost for this project is $300,000 to $6,000,000. The completion date for this contract will be 24 months after authorization to proceed. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS).. The method of contractor selection has not been determined at this time. ILDOT - 14 - RFP Engineering - Flossmoor Road and 183rd Street Bridge Structures, Phase II Project
Post-Bid
Bridges / Tunnels
$6,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Mar 06 2025
Chicago, IL
Bid Date: Apr 08 2025
Chicago, IL
Bid Date: Feb 25 2025
Chicago, IL
Bid Date: Apr 22 2025
Chicago, IL
Bid Date: Feb 13 2025
Chicago, IL
Bid Date: Feb 14 2025
Chicago, IL
Bid Date: Feb 06 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.