BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work and paving for a mixed-use development in Pueblo, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of August 6th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Northern Avenue Trail Phase 3 project involves constructing a concrete trail of varying width along the north side of Northern Avenue from Cambridge Avenue to Prairie Avenue, and then along the west side of Prairie Avenue from Northern Avenue to approximately Purdue Avenue as well as traffic and pedestrian signal improvements. Additional work will consist of landscape and streetscape improvements for enhanced aesthetics, ADA compliant ramps, installation of pedestrian counter pedestal and associated removals to facilitate new construction. Question Deadline 07/01/2025 at 4:00 PM MT Questions electronically through the OpenGov portal. The Underutilized Disadvantaged Business Enterprise (UDBE) goal is 2% Percent. Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award. Failure to complete the work by the allotted 180 calendar days shall result in the assessing of liquidated damages according to GENERAL PROVISIONS. 25-001R (PL2003) Contractor must be capable of, and shall be required to, self-perform at least thirty percent (30%) of the actual labor or trade work (not supervision) required to complete the project. By submitting a bid, Contractor certifies that Contractor's own employees shall be utilized to meet the self-performance requirement. Supervision of subcontractors is not considered self-performance. Failure to meet this requirement may result in the bid being deemed non-responsive. Documented confirmation that Contractor is meeting this requirement during the performance of the work will be required. Pre-bid information Dial in by phone +1 719-467-7197,,844206367# United States, Pueblo Phone conference ID: 844 206 367# Solicitation no: 157268

Bid Results

Sidewalks / Parking Lot

$1,234,404.00

Public - City

Paving, Site Work

40

10

2

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
24
Bidding Soon
300
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

September 8, 2025

Project location map

E Northern Ave, Pueblo, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.