Published March 11, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Elba, New York. Completed plans call for the renovation of a educational facility.

*As of March 11, 2025, low bidder contractor was awarded at the BOE meeting held last night. Elba Central School District - 2023 Capital Improvement Project - Main Building - Mechanical Work All pre-bid questions shall be submitted to Allison Thomson and Chad Pruner, Campus Construction, at athomson@campuscmg.com and cpruner@campuscmg.com, using the Request for Information (RFI) form found in specification section 006000. Questions will be accepted until 12:00 p.m. February 17, 2025. A Bidder whose bid is accompanied by a certified check or other security in accordance with the bidding requirements and public advertisement, and who returns a complete set of Bidding Documents in good condition within thirty (30) days following the award of the Contract covered by such Bidding Documents or the rejection of such bid, shall receive a refund of the full amount of the deposit for (1) copy of the Bidding Documents. Partial reimbursement in an amount equal to the deposit for (1) set of the Bidding Documents, less the actual cost of reproduction of the Bidding Documents, shall be made for the return of all other copies of the Bidding Documents in good condition within thirty (30) days following the award of the Contract or the rejection of the bids covered by such Bidding Documents. Attention of the Bidder is particularly called to the Owner's sales tax exemption, the requirements as to conditions of employment to be observed, the minimum wage rates to be paid under the contract, and the New York State Department of Labor Contractor Registry. In addition, the Bidding Documents for this project contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party, a statement of surety's intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. Bids shall be prepared as set forth in "Instructions to Bidders", enclosed in a sealed envelope bearing on its face the name and address of the Bidder and the title of the Work to which the bid enclosed relates. Each Bidder shall deposit with its bid, security in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the "Instructions to Bidders." No Bidder may withdraw his bid within forty-five (45) days after the actual bid opening. The Owner reserves the right to waive any and all informalities in or to reject any or all bids. The Owner further reserves its right to disqualify Bidders for any material failure to comply with the "Instructions to Bidders". Main Building: 18-09-01-04-0-001 -021 Anticipated Notice to Proceed 03/11/2025 Start of Construction 04/01/2025 Substantial Completion 08/31/2026 Final Completion 11/23/2026

Award

Educational

$1,765,000.00

Public - City

Renovation

200

28

19

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Fabricator Qualifications, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Construction, Construction Aids, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Sheet Waterproofing, Thermal Protection, Thermal Insulation, Air Barriers, Roofing and Siding Panels, Membrane Roofing, Elastomeric Membrane Roofing, Ethylene-Propylene-Diene-Monomer Roofing, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Aluminum Doors and Frames, Wood Doors, Flush Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Window Hardware, Window Operators, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Wood Flooring, Resilient Flooring, Resilient Athletic Flooring, Fluid-Applied Flooring, Carpeting, Tile Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Cubicle Curtains, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Storage Assemblies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Entertainment Equipment, Athletic Equipment, Gymnasium Equipment, Recreational Equipment, Play Field Equipment and Structures, Athletic Field Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furnishing Accessories, Clocks, Rugs and Mats, Runners, Furniture, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Vehicle Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Identification for Fire-Suppression Piping and Equipment, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, HVAC Power Ventilators, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Parking Bumpers, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Screening Devices, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Storm Drainage Utilities, Subdrainage, Drainage Layers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Manufacturing Lines and Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
127
Bidding Soon
2,530
All Active Projects
991
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

April 1, 2025

img_map_placeholder

57 S Main St, Elba, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Elba CSD 2023 CIP Project - Mechanical Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.