BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Renovation of a mixed-use development in Palatine, Illinois. Completed plans call for the renovation of a educational facility; and municipal facility.

A Performance and Payment Bond in the Full Contract Amount is Required. A Bid Security of 10% of the Bid is Required With the Proposal. Wood Floor Refinishing & Resilient Flooring Replacement at Conant, Fremd, Hoffman Estates, Palatine, & Schaumburg High Schools. The Contractor Must Pay the Prevailing Wage Rates for All Work Per Illinois Law. It is the Policy of Township High School District 211 to Provide Equal Opportunity to All Qualified Businesses in the Awarding of Contracts and Accordingly Promotes the Utilization of Diversified Businesses to the Maximum Extent Feasible in Any Contract Issued Against This Solicitation to Bid. The Owner Reserves the Right to Reject Any or All Bids, to Waive Irregularities in the Bidding Procedure, or Accept the Bid That in Its Opinion Will Serve Its Best Interest. Any Such Decision Shall Be Considered Final. The Owner Reserves the Right to Set Aside a Bid From a Contractor Who, in the Owner's Opinion, Does Not Exhibit Past Experience Equal to the Size and Scope of This Project. Interested Bidders Must Attend This Meeting to Be Considered for the Work. The Bidder Shall Have a Written Sexual Harassment Policy in Place in Full Compliance With Section 2-105 of the Illinois Human Rights Act. Prevailing Wage Law: This Contract Calls for the Construction of a public Work, Within the Meaning of the Illinois Prevailing Wage Act, 820 Ilcs 130/.01 Et Seq. . The Act Requires Contractors and Subcontractors to Pay Laborers, Workers and Mechanics Performing Services on Public Works Projects No Less Than the Current prevailing Rate of Wages(Hourly Cash Wages Plus Amount for Fringe Benefits) in the County Where the Work is Performed. A Performance and Payment Bond in the Full Contract Amount is Required. Bid Results WOOD REFINISHING Kiefer USA - $214520 RESILIENT FLOORING Consolidated Flooring of Chicago - $211954 Award 1. Consolidated Flooring of Chicago (Base bid #2 and Alternate #1) $ 229,689 2. Kiefer America, LLC d/b/a Kiefer USA (Base bid #1) $214520

Award

Educational

$444,209.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
308
Bidding Soon
3,820
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

Project location map

Multiple Locations, Palatine, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.