BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Renovation of a mixed-use development in Rochester, Michigan. Working plans call for the renovation of a educational facility.

As of March 27, 2025, construction is anticipated to commence June 2025 and be complete August 2025. Description: Structure Tec Bid Package - 2025 Restoration Program - RHS, Adams HS, and Hugger Elementary Architect: Structure Tec 34119 W. Twelve Mile Road, Suite 270, Farmington Hills, MI 48331 Construction Manager: Frank Rewold and Sons Inc. 303 E. Third St., Suite 300, Rochester, MI 48307 Estimators: Mike Gagnon (248) 618-0220 mgagnon@frankrewold.com Questions addressed ONLY to Mike Gagnon Labor and Material and Performance Bond: In accordance with Michigan Compiled Laws Section 129.201, successful contractor(s) must obtain Performance and Payment Bonds for any Bid Category exceeding $50,000. The Performance and Payment Bonds shall be in an amount equal to the contract amount. The Performance and Payment Bonds shall be for the protection of Rochester Community Schools and Frank Rewold and Son Inc. and shall be executed by a surety company authorized to do business in the state of Michigan and be listed in Federal Register or have an AM Best Rating of B+ or better. All bonds to be dual obligee bonds to Rochester Community Schools and Frank Rewold and Son Inc. Prevailing Wage Rates: Not required Bid Bond: 5% bid security required. Bid bonds are required, however, certified or cashier checks are acceptable for bids under $50,000. Nonexempt: This project is not tax exempt for state sales tax and/or use tax. All materials and supplies incorporated and used in construction and becoming a permanent part of this project will not be exempt from state sales tax and/or tax Disclosure Statements: Each bid proposal must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between owner or any employee of bidder and any member of board of education or superintendent of Rochester Community Schools. Each bid proposal must also include a signed Iran Economic Sanctions Affidavit. The board of education will not accept a bid proposal that does not include this sworn and notarized disclosure statement or the Iran Economic Sanctions.

Pre-Construction/Negotiated

Educational

$3,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
154
Bidding Soon
2,343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

June 16, 2025

Project location map

Multiple Locations, Rochester, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.