Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 13, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a civil project in Parker, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reference Number 0000375567 Job Location: Town of Parker Construction of approximately 2,500 feet of an addition to an existing collector roadway for the widening of Stroh Road from the J Morgan Boulevard intersection, crossing Cherry Creek to the Motsenbocker/Crowfoot Valley Road intersection plus reconstruction of approximately 2,500 feet of Stroh Road in the same area. Construction also includes the extension of J Morgan Boulevard to the South approximately 500 feet. Included with this roadway construction, but not limited to, will be an approximate 300-foot long, 3-span bridge (2-lanes), approximately 4,000 tons of stone matrix asphalt, approximately 1,000 cubic yards of concrete paving, approximately 10,000 tons of hot mix asphalt paving, storm sewer drainage (culvert, drainage swale and sand filters) improvements with associated inlets/manholes, upgrades to one (1) traffic signal, installation of one (1) traffic signal, waterline installation, sanitary line installation, earthwork, aggregate base course, geogrid, concrete flatwork, signage, pavement markings, traffic control and seeding/mulching work. Question Deadline 03/06/2025 at 5:00 PM MT Questions are submitted online No, All bidders questions and inquires shall be directed to the Town of Parker's Project Manager, Nathan Klass nklass@parkerco.gov 303-805-3298 Contract shall be completed on or before April 30, 2027, for this project. Liquidated damages will be charged in accordance with Trade Contractor's Agreement, Article 4. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % All bids must be accompanied by a Bid Bond in an amount of at least five percent (5%) of the Bid. The vendors can upload their bid bond when responding online. The bond will be retained by the Town as liquidated damages if the successful bidder refuses or fails to enter into a Contract and Performance, Payment and Maintenance bond in accordance with his bid when notified of the award. Bids may not be withdrawn for a period of forty-five (45) days after the time fixed for closing them. The Owner reserves the right to waive irregularities, to waive technical defects accordingly as the best interest of the Town may be served, may reject any and all bids, and shall award the contract to the lowest responsible bidder as determined by the Owner. Bid Open Desc -One tap mobile +17193594580,,81833128469# US +12532158782,,81833128469# US (Tacoma) --- Dial by your location o +1 719 359 4580 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) o +1 669 444 9171 US o +1 669 900 9128 US (San Jose) o +1 253 205 0468 US o +1 564 217 2000 US o +1 646 558 8656 US (New York) o +1 646 931 3860 US o +1 689 278 1000 US o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US Meeting ID: 818 3312 8469
Post-Bid
Roads / Highways
$500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
April 14, 2025
Stroh Rd, Parker, CO
Related To This Project
Parker, CO
Bid Date: Mar 11 2025
Parker, CO
Bid Date: Mar 06 2025
Parker, CO
Bid Date: Mar 06 2025
Parker, CO
Bid Date: Mar 19 2025
Parker, CO
--
Parker, CO
Bid Date: Feb 07 2025
Parker, CO
Bid Date: Feb 11 2025
Parker, CO
Bid Date: Feb 07 2025
Parker, CO
Bid Date: Feb 18 2025
Parker, CO
Bid Date: Feb 05 2025
Parker, CO
Bid Date: Feb 04 2025
Parker, CO
Bid Date: Jan 09 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.