Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2025 at 8:00 PM
Updated March 22, 2025
Site work for a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for site work for a road / highway.
Project questions should be directed to Ken Main, Director of Facilities, Grounds and Operations, 724-694-1401 Ext. 1415. Proposal must be accompanied by bid bond in the amount of 10% of the total proposal and submitted in a sealed envelope marked GV PARKING LOT SEALING & PAINTING 2025, to the above address. No proposal may be withdrawn for a period of ninety (90) days after the date of opening. The School Board reserves the right to accept or reject any or all proposals, or to award the contract which, in their judgment, will best serve the interest of the DASD . SCOPE: 1. The area is to have cracks filled, seal coating area is estimated to be 170,000 sq. ft. 2. Barricade all areas where work will be performed. DASD is responsible for ensuring that the work area is free of all material, cars, equipment etc.. 3. All surfaces are to be cleaned of all loose material, weeds, grass, and dirt to ensure optimum adhesion to the existing surface. Degrease all spots necessary as part of the surface preparation. 4. Crack filling is to be a hot rubberized non-tracking sealant application limited to 1/4 inch to 1 inch. It is not required to crack fill alligatored areas or hairline cracks. A light sprinkle of sand is necessary if there is to be any foot traffic after or during the application. 5 Two full coats of Polymer-Modified MasterSeal (PMM) asphalt-based pavement sealer applied by broom and spray application. The second coat must be a complete overlap coverage. Half lap coverage will not be accepted. Material extenders or thinners are not to be used. 6. Map or mark all existing striping and restripe per the existing layout with Sherwin Williams traffic paint. A (1) year warranty is required for this process. * Curbing, bollards, light pole bases and car stops are not included in the restriping process. 7. 4-inch-wide line striping (7) Handicap Stalls (6) Visitors Stalls (20) Bus Stalls (3) Fire Lane (2) Cross Walks No Parking Fire Lane Alternate Bid #1: GV Basketball/Undercover Area Alternate Bid #2: Football Field Walkway to Pressbox
Post-Bid
Roads / Highways
$90,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
