Renovation of a power facility in Pickering, Ontario. Completed plans call for the renovation of a power facility.

Retube feeder and boiler replacement program for the Pickering Nuclear Generating Station's "B" units. The joint-venture will carry out work for Units 5, 6, 7 and 8 at the nuclear generating station. Scope of work is for "definition phase activities including engineering, procurement of long-lead components, and construction planning for the multi-unit refurbishment". Once refurbished, Pickering would produce more than 2,000 megawatts of electricity, which is equivalent to powering two million homes. TIMELINE: The provincial government has announced the start of construction. Units 5 to 8 will be removed from service by the end of September 2026. With site construction underway, reactor refurbishment work will begin pending final approval from the Canadian Nuclear Safety Commission (CNSC) in January 2027. Preliminary estimates show the entire refurbishment will be completed by the mid-2030s. Awarded trades will not be released for publication. *Aecon Group Inc. and AtkinsRéalis have been awarded a 2.1 billion contract by Ontario Power Generation (OPG). The Joint-Venture is known as CanAtom Power Group. *The Ontario government is supporting OPG's 4.1 billion budget for this phase of work, bringing the total investment to date in the project to $6.2 billion.

Under Construction

Power Plant

$6,200,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
629
Active Projects
296
Bidding Soon
4,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

Project location map

1675 Montgomery Park Rd, Pickering, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.