EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Orlando, Florida. Completed plans call for site work for a water / sewer project.

VillaSol Community Development District (District) will receive proposals for the following District project: Repairs of stormwater pipe and structures with open cut construction and Cured-InPlace-Pipe (CIPP) pipe installation Each Project Manual will include, but not be limited to, the Request for Proposals, proposal and contract documents, and construction plans and specifications. The District reserves the right to reject any and all proposals, make modifications to the work, award the contract in whole or in part with or without cause, provide for the delivery of the project in phases, and waive minor or technical irregularities in any Proposal, as it deems appropriate, if it determines in its discretion that it is in the Districts best interests to do so. Each proposal shall be accompanied by a proposal guarantee in the form of a proposal bond or certified cashiers check in an amount not less than five percent (5%) of the total bid to be retained in the event the successful proposer fails to execute a contract with the District and file the requisite Performance and Payment Bonds and insurance within fourteen (14) calendar days after the receipt of the Notice of Award. Any person who wishes to protest the Project Manual, or any component thereof, shall file with the District a written notice of protest within seventy-two (72) calendar hours (excluding Saturdays, Sundays, and state holidays) after the Project Manual is made available, and shall file a formal written protest with the District within seven (7) calendar days (including Saturdays, Sundays, and state holidays) after the date of timely filing the initial notice of protest. Filing will be perfected and deemed to have occurred upon receipt by the District Manager directed to District Manager, Jason M. Showe, jshowe@gmscfl.com, Governmental Management Services. Failure to timely file a notice of protest or failure to timely file a formal written protest shall constitute a waiver of any right to object to or protest the contents of the Districts Project Manual. Any and all questions relative to this project shall be directed by e-mail only to Peter Armans, parmans@Dewberry.com, no later than Monday, March 3, 2025, at 2:00 p.m. Firms desiring to provide services for this project must submit one (1) original and eight (8) copies of the required proposal no later than 2:00 p.m. on, Monday, March 10, 2025, at the office of the VillaSol CDD, 219 E. Livingston St Orlando, FL 32801.

Post-Bid

Water / Sewer

$400,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Warranties
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
96
Bidding Soon
1,522
All Active Projects
773
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 9, 2025

img_map_placeholder

Multiple Locations, Orlando, FL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Storm System Repairs Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.