Published March 24, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Orlando, Florida. Completed plans call for the renovation of a transportation facility.

The project involves replacing the aging mechanical equipment at LYNX Central Station and Operations base buildings A, B, and C, which were constructed in 2003-2004. Some equipment will be upsized to address ongoing cooling issues. Each building has separate contract documents and permit packages, except for building C, which is included in building Bs package. Project consists of the replacement of the existing HVAC system that was originally intalled in 2003. Scope also includes the installation of several new airhandling units to supplement the existing systems. Building shall remain operationable during construction and will require contractor phasing coordination with owner.

Post-Bid

Transportation Terminals

$30,000.00

Public - State/Provincial

Renovation

254

46

4

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Cooling Equipment, Packaged Water Chillers, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
97
Bidding Soon
1,653
All Active Projects
721
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

April 30, 2025

img_map_placeholder

455 N Garland Ave, Orlando, FL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

LYNX HVAC Equipment Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.