BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated April 1, 2025

Renovation of a transportation facility in Orlando, Florida. Completed plans call for the renovation of a transportation facility.

The project involves replacing the aging mechanical equipment at LYNX Central Station and Operations base buildings A, B, and C, which were constructed in 2003-2004. Some equipment will be upsized to address ongoing cooling issues. Each building has separate contract documents and permit packages, except for building C, which is included in building Bs package. Project consists of the replacement of the existing HVAC system that was originally intalled in 2003. Scope also includes the installation of several new airhandling units to supplement the existing systems. Building shall remain operationable during construction and will require contractor phasing coordination with owner.

Post-Bid

Transportation Terminals

$30,000.00

Public - State/Provincial

Renovation

254

46

4

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
160
Bidding Soon
2,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

April 30, 2025

Project location map

455 N Garland Ave, Orlando, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.