Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Site work for a water / sewer project in Southlake, Texas. Completed plans call for site work for a water / sewer project.

This project consists of new sidewalk construction and waterline reconstruction along the east side of Randol Mill Avenue, from Morgan Road to just south of Dove Road, with drainage improvements and erosion control improvements. The Contractor will be selected based on offering the best value to the City. Proposers must submit a cashier's check, certified check, or acceptable bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the Owner within ten (10) days of Notice of Award of the contract. The security must be payable to the City of Southlake in the amount of five percent (5%) of the proposal submitted. Contractor must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents. Contractors for this Project must pay no less than the prevailing wage rates for the area established by the Owner and included in the contract documents. Performance, Payment and Maintenance Bonds, bound to the City of Southlake are required, each in an amount of not less than one-hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials. The intent of the documents, unless otherwise specifically provided, is to produce complete and finished work, which the CONTRACTOR undertakes to do in full compliance with the Contract documents. It is not intended to mention every item of work in the specifications that can be adequately shown on the drawings nor to show on the drawings all items of work described or required by the specifications. All materials or labor for work shown on the drawings or reasonably inferable therefrom as being necessary to produce a finished job shall be provided by the CONTRACTOR whether or not same is expressly covered in the specifications. No verbal conversation, understanding or agreement with any officer or employee or agent of the OWNER, either before or after the execution of the Contract, shall affect or modify any of the terms, conditions or obligations contained in the Contract documents. The CONTRACTOR shall do all work as provided in the plans, specifications, special provisions, bid and contract, and shall do such additional extra work as may be considered necessary to complete the work in a satisfactory manner acceptable to the OWNER. The CONTRACTOR shall furnish all labor, tools, materials, machinery, equipment, and incidentals necessary to the satisfactory prosecution and completion of the work. Completion- 150 working days

Award

Water / Sewer

$2,450,000.00

Public - City

Site Work

70

13

20

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
190
Bidding Soon
4,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

August 19, 2025

Project location map

S Randol Mill Ave, Southlake, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.