BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2025 at 7:00 PM

Updated March 11, 2025

Renovation of a mixed-use development in Dublin, Georgia. Completed plans call for the renovation of a medical facility.

The Contractor shall furnish all labor, tools, materials and equipment to support installation of replacement and new WiFi Access Points at Carl Vinson VA Medical Center located at 1826 Veterans Blvd. Dublin, GA The AT&T NextGen WiFi Contractor is responsible for the bulk of the work under a separate OI&T contract. Please note that the scope of this work is limited and specifically as listed below. 2. STATEMENT OF WORK: Provide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation on the Dublin VA campus as shown and described in the project drawings and specifications. A list of required conduits and/or penetrations are provided in SOW Attachment 1. Work shall include: 1. Installation of 23 Access Points. Access Points shall be provided by the VA, but the mounting brackets shall be provided by the Contractor. 2. Installation of 5,000 linear feet of conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Center. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created. 3. Installation of approximately 5,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. Recommend Offerors verify field conditions in a pre-bid site walk. Work shall be completed after hours and on weekends. OR All work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM. Work shall not disrupt patient care. Any work expected to disrupt patient care will be done after hours or on weekends. A site visit is available as needed. Please reach out to kenyon.dulaney@va.gov to schedule The magnitude of construction for this project is estimated to be between $100,000 and $250,000. The Contractor shall furnish all labor, tools, materials and equipment to support installation of replacement and new WiFi Access Points at Carl Vinson VA Medical Center located at 1826 Veterans Blvd. Dublin, GA. Requests for Information (RFIs) to be submitted no later than February 14th, 2025 at 3:00PM EST. The purpose of this amendment is to announce the date & time for the organized site visit for Project#557-25-704 EHRM Installation of Next Gen Wifi and to extend the due date for RFI's and Quotes. The organized site visit will take place Tuesday, February 18th 2025 at the Engineering Building (Bldg. 29) conference room at 10:00AM EST. Carl Vinson VA Medical Center 1826 Veterans Boulevard, Dublin, GA 31021 The due date for RFI's has been extended to Tuesday, February 25th 2025 at 3:00PM EST. The due date for Quotes has been extended to Tuesday, March 4th 2025 at 3:00PM EST. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$250,000.00

Public - Federal

Renovation

73

10

8

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
49
Bidding Soon
535
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 9, 2025

Project location map

1826 Veterans Blvd, Dublin, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.