EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Raleigh, North Carolina. Completed plans call for site work for a water / sewer project.

This phased project replaces approximately 1800 feet of 1960s vintage 8 cast iron water main with 12 ductile iron, and includes replacing hydrants. The scope is from Jordan Hall (Faucette Drive) to Morrill Drive and then along Morrill Drive to Rocky Branch Creek. Morrill Drive is a very busy campus thoroughfare and will require careful traffic control. North Carolina State University is seeking qualification statements from general contractors for improvements to the Morrill Drive and Phase II Campus-Wide Domestic Water Line Replacement, located in NC State's Central Campus Precinct. This phased project replaces approximately 1800 feet of 1960s vintage 8 cast iron water main with 12 ductile iron and includes replacing hydrants. The scope is from Jordan Hall (Faucette Drive) to Morrill Drive and then along Morrill Drive to Rocky Branch Creek. NC State University has an affirmative policy of fostering, promoting, and conducting business with women and minority-owned enterprises. Women and minority contractors are encouraged to participate in the prequalification process.

Post-Bid

Water / Sewer

$3,017,614.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
57
Bidding Soon
1,148
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

May 15, 2025

img_map_placeholder

Morrill Dr, Raleigh, NC


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ Contractor - Morrill Drive and Phase II Campus - Wide Domestic Water Line Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.